Similar Projects
Last Updated | 01/26/2023 05:41 PM |
Project Title | University Of Wisconsin Oshkosh - Chiller and Cooling Tower Replacement - General |
Physical Address | View project details and contacts |
City, State (County) | Oshkosh, WI 54901 (Winnebago County) |
Category(s) | Education |
Sub-Category(s) | College/University |
Contracting Method | Competitive Bids |
Project Status | Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,660,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of Oct 20, the project will be out for rebid. In general, the work consists of: This project replaces the 450-ton cooling tower for chiller #3 to a 1400-ton tower including connecting to the existing tower #1 and #2 piping so the chillers can utilize either or all of the towers for better efficiency. The existing DDC controls will be replaced with PLC control for the entire plant to integrate the existing chiller machines to work in unison. The evaporator pumps will be removed, and the chilled water side converted to a variable primary flow system. The condenser water pumps for chiller #2 and chiller #3 will be replaced. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |