Last Updated | 08/10/2022 11:31 PM |
Project Title | Villa Avenue Street Improvements |
Physical Address | View project details and contacts |
City, State (County) | Clovis, CA 93612 (Fresno County) |
Category(s) | Heavy and Highway, Outdoor Lighting, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $704,320 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project involves rehabilitating AC pavement, reconstructing curb ramps, modifying traffic signals, installing loop detectors, adjusting manholes and valve boxes to finished grade, and restriping as needed on Villa Avenue. Liquidated Damages : 1,000 per Calendar Day The Work to be performed under this Contract as described below shall consist of furnishing all materials, equipment, supplies, labor and transportation, and performing all Work as required by and in strict accordance with the Contract Documents, all of which are made a part hereof. The Work shall be complete, including all Work, material, and services not expressly called for or shown in said Contract Documents, which may be necessary for completion and proper construction to carry out the Contract in good faith. The site of Work shall be left in a neat condition. The cost of all Work performed, furnished, and installed is to be included in the amount bid for the various items of Work with no separate compensation allowed therefore. The project includes furnishing all labor, materials, services and equipment; performing all work necessary as specified for, but not limited to, street rehabilitation along an existing 4-lane arterial with bike lanes. The work includes pulverize in place full depth removal of AC pavement and replacing in areas of severe structural failure, adjusting utility boxes and manhole lids to grade, constructing ADA curb ramp improvements, installing detector loops and striping to match the existing of Villa Avenue. All Work shall be performed in accordance with the applicable portions of the City of Clovis 2020 Standard Specifications and 2020 Standard Drawings, or latest revision; the applicable portions of the State of California Department of Transportation (Caltrans) 2018 Standard Specifications and the Caltrans 2018 Standard Plans as specified herein. The scope of Work is outlined in the Contract Documents, including but not limited to the Plans and Contract Specifications. Note that all storm drain facilities shall be completed in accordance with the applicable portions of the Fresno Metropolitan Flood Control District (FMFCD) District Standard, dated April 1, 2011 or latest revision. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |