Similar Projects
Down-Town Infrastructure Improvements - Phase 2
Term Contract
Post-Bid
Rumford, ME

New Muddy Brook Bridge Wearing Surface Replacement
Results
New Sharon, ME 04955

2020 Roadway Paving
Results
Norway, ME

Loon Lake Road Rangeley
Results
Rangeley, ME

Hot Mix Asphalt Overlay With Safety Improvements
Results
ME

(LCP) Light Capital Paving
Results
Anson, Farmington, New Sharon, Starks, Town Of Chesterville, ME 04938

(LCP) Light Capital Paving
Results
Chesterville, Farmington, Fayette, Temple, Town Of Chesterville, Wilton, ME 04938

Cyclical Pavement Resurfacing and Safety Improvements
Results
Fryeburg, Lovell, ME 04037

(LCP) Light Capital Paving
Results
Bridgton, Casco, Gorham, Harrison, Naples, Otisfield, Oxford, Sebago, Standish, Waterford, ME 04009

On Call Maintenance Paving/Located in Regions 1-5
Results

2020 Roadway Paving
Results
Less than $300,000 est. value
Paris, ME

East B Hill Road Reconstruction
Results
Upton, ME

Pavement Milling, Ultra-Thin Bonded Wearing Course with Safety Improvements
Results
Farmington, Town Of Chesterville, ME 04938

Crack Sealing
Results
Phillips, Strong, Wilton, ME 04966

2020 Roadway Improvements
Results
Oxford, ME

Last Updated 04/29/2021 07:32 AM
Project Title

Crack Sealing

Physical Address View project details and contacts
City, State (County) Carthage, Dixfield, Farmington, Phillips, Wilton, ME (Franklin, Oxford Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Location: In Franklin County. Priority 1 is located on Route 4 in Phillips beginning 0.11 mile south of Partridge Road and extending north 1.12 miles to 0.30 mile south of Number 6 Road. Priority 2 is located on US Route 2 beginning in Dixfield 0.04 mile east of Stone Road and extending east 18.40 miles to Livermore Falls Road in Farmington.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents