Similar Projects
Mesivta of Clifton Secondary School
Addition, Renovation, Infrastructure
Conception
$1,000,000 CJ est. value
Clifton, NJ 07014

Palestinian American Community Center
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Clifton, NJ 07011

Taco Bell Restaurant / Paterson
New Construction, Infrastructure - 1,679 SF
Design
$512,095 CJ est. value
Paterson, NJ 07501

Wallington Pumping Station Rehabilitation Project
Renovation, Infrastructure
Bidding
$400,000 CJ est. value
Passaic, NJ 07055

Wallington Pumping Station Rehabilitation Project
Renovation, Infrastructure
Bidding
$400,000 CJ est. value
Passaic, NJ 07055

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Lead Service Line Replacement in the Main System
Infrastructure
Post-Bid
$40,000,000 to $50,000,000 est. value
Clifton, NJ

Ward Street Parking Garage - General Construction
New Construction, Infrastructure
Results
$21,200,000 CJ est. value
Paterson, NJ 07505

Emergency Repairs To Utilities at Various State Non-Secured Facilities
Term Contract
Results

NES Group Distribution Center Addition
Addition, Demolition, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Clifton, NJ 07012

Commerce Way Flex Warehouse Building
New Construction, Infrastructure - 253,443 SF
Pending Verification
$27,000,000 CJ est. value
Totowa, NJ 07512

Impact Steel Totowa
Addition, Infrastructure - 1,767 SF
Design
$375,000 CJ est. value
Totowa, NJ 07512

LDS Meetinghouse / Passaic
New Construction, Infrastructure - 8,910 SF
Bidding
$4,000,000 CJ est. value
Passaic, NJ 07055

Construction Management Services Improvements to 19 Facilities at Clifton BOE
Renovation
Post-Bid
Clifton, NJ 07013

Emergency Repairs to Utilities at Various State Secured Facilities
Term Contract
Results

Last Updated 11/23/2022 03:05 PM
Project Title

Early Childhood Center Renovation (Re-Bid 2)

Physical Address View project details and contacts
City, State (County) Woodland Park, NJ 07424   (Passaic County)
Category(s) Education, Heavy and Highway, Sewer and Water
Sub-Category(s) Elementary School, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Architect - 11/01/22
Owner View project details and contacts
Architect View project details and contacts
Description

All general contractors will be required to sign in at the Main Office and proceed to the meeting as directed. All bidders will be required to complete and return the Inspection of Site Form (part of the bid package). The project consists of the following 1. Interior renovation of existing preschool which includes ground floor and 1st floor in building 1 and ground floor and 1st floor in building 2. 2. Scope of work to include demolition of some partition walls, plumbing fixtures and piping, floor, and wall finishes, etc. Throughout both buildings, as well as replacement of concrete slab flooring at existing garage in building 1, along with the demolition of existing garage doors. 3. Scope shall include installation of new partitions, power and data, lighting, HVAC, mechanical, plumbing, and structural upgrades, to create new classroom layouts, new restrooms, new nurse station, new staff break room, new storage areas, etc., as well as the installation of new door, windows, and wall to match existing at garage door location. 4. Scope shall include upgrade and repair of existing areas to remain in order to meet district standards. 5. Site work includes a new sanitary line for two bathrooms at building 1 that will tie into exterior sanitary pipe, electrical and gas utility services, as well as connection data wiring from building 1 to building 2. Bids will be considered in accordance with N.J.S.A. 18A:18A-1 et.seq. and N.J.S.A. 18A:7G-1 et.seq. Bids will be received from a Bidder for one price for the entire project, all trades, all inclusive. DPMC classifications for this project shall include, but not be limited to, if applicable, C008, C009, C010, C011, C015, C016, C017, C018, C021, C029, C030, C032, C046, C047, C048, C068, C073, C077 and C092. Bidders must be pre-qualified by the New Jersey Department of Treasury, Division of Property Management and Construction (DPMC) in one of the following categories, pursuant to N.J.S.A. 18A:18A-27.1, et.seq.: C008 General Construction C009 General Construction/Alterations and Additions In addition, the Bidder shall be classified in, or engage a properly classified subcontractor for each trade listed below in which the Bidder is not so classified: C029 Structural Steel and Ornamental Iron C030 Plumbing C032 HVACR C047 Electrical Bidders and subcontractors for each of the major branches of work specified in N.J.S.A. 18A:18A-18 must be prequalified by the DPMC. Bidders shall submit a Certificate of Prequalification/Classification from the New Jersey Department of Treasury, Division of Property Management and Construction (DPMC) and Affidavit as to the Total Amount of Uncompleted Contracts for the Bidder and for all subcontractors for whom DPMC prequalification is required. No modifications to the enclosed Instructions to Bidders, General Conditions, Supplemental Conditions or Specifications will be permitted prior to bid acceptance except as may be allowed by addenda as outlined in the Specifications. Bids that propose modifications to the requirements shall result in rejection of the bid as being non-responsive. All bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq., Affirmative Action Against Discrimination (N.J.A.C. 17:27-1 et seq.). An Initial Project Workforce Report will be required from the successful Contractor. (Form AA-201). Statement of Ownership Requirement: Pursuant to N.J.S.A. 52:25-24.2, Bidders shall submit a statement setting forth the names and addresses of all persons and entities that own ten percent or more of its stock or interest of any type at all levels of ownership. Bidders and all subcontractors are required to comply with the Public Works Contractor Registration Act, (N.J.S.A. 34:11-56.48 et seq.) and to possess current certification from the Division of Wage and Hour Compliance in the Department of Labor and Workforce Development at the time the bid is submitted. Bidders and all subcontractors for whom DPMC prequalification is required are also required to submit a Business Registration Certificate issued by the Division of Revenue in the New Jersey Department of Treasury prior to contract award. All Bidders are required to submit with the bid, an affidavit by the Bidder that the Bidder is not, at the time of the bid, included on the New Jersey State Treasurers List or the Federal Government List of Debarred, Suspended or Disqualified Firms or individuals pursuant to NJSA 52:32-44.1, N.J.A.C. 17:19-4 and N.J.A.C. 19:38A-4. Then, prior to contract award, the successful Bidder will be required to submit separate certification that all entities having controlling interest are not on the federal list of debarred contractors. All Bidders are required to complete and submit, prior to contract award, a Disclosure of Investment Activities in Iran Form in accordance with N.J.S.A 52:32-58 and N.J.S.A. 18A:18A-49.4. Bids must be accompanied by bid security in the form of a bid bond or certified or cashiers check payable to Woodland Park Board of Education equal to 10% of the amount of the bid, but in no case to exceed $20,000.00 per N.J.S.A. 18A:18A-24, and (2) Certificate of Consent of Surety per N.J.S.A. 18A:18A-25. The successful bidder will be required to furnish additional bonds as specified. The Woodland Park Board of Education reserves the right to reject all bids, to waive minor immaterial defects in any bid, or to award a lump sum contract, in accordance with applicable laws, including the requirements of the Public School Contracts Law at N.J.S.A. 18A:18A-1 et seq. No bid may be withdrawn for a period of sixty (60) days after the opening date. The Contract will be awarded to the lowest responsible bidder as defined in N.J.S.A. 18A:18A-2(t) and N.J.S.A. 18A:18A-18 (c), as applicable. If necessary, an Addendum will be issued no later than Friday, November 11, 2022.

Details

2 Stories Above Grade, Renovation, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents