Similar Projects
Road Widening and Reconstruction Poinciana Boulevard
Infrastructure
Design
FL

West Oak Street Intersection Improvements at John Young Parkway
Infrastructure
Bidding
$300,000 est. value
Kissimmee, FL 34741

West Oak Street Intersection Improvements at John Young Parkway
Infrastructure
Bidding
$300,000 est. value
Kissimmee, FL 34741

Pavement, Sidewalk, Curb and Gutter Repair Services
Post-Bid
Kissimmee, FL

Pavement, Sidewalk, Curb and Gutter Repair Services
Post-Bid
Kissimmee, FL

CDBG Funded Sidewalk Construction Project for KOA Elementary School
Results
Kissimmee, FL 34758

Add Left Turn Lane(s)
Results
Less than $2,004,920 est. value
FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Hudson Street Improvements
Results
$321,010 est. value
Kissimmee, FL 34741

Neptune Elementary Parent Loop Project
Infrastructure
Post-Bid
Saint Cloud, FL 34769

Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Results

Harmony Neighborhoods C-1 and C-2 Roadway Rehabilitation
Infrastructure
Post-Bid
$2,000,000 est. value
Saint Cloud, FL

Toho-Valencia Trail II
Infrastructure
Results
$250,000 est. value
Kissimmee, FL

Fortune Road and Simpson Road Intersection Improvement Project
Infrastructure
Post-Bid
$2,000,000 est. value
Kissimmee, FL 34746

Construction of Fortune-Lakeshore Multi-Use Trail Project
Infrastructure
Results
Kissimmee, FL 34746

Last Updated 07/12/2022 05:02 AM
Project Title

Construction Services for Simpson Road Widening Phase I Project

Physical Address View project details and contacts
City, State (County) Kissimmee, FL 34746   (Osceola County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $15,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The new typical section of the Simpson road includes constructing 10 foot wide sidewalks on both sides and 11 foot travel lanes. The median will be modified to match the lane configurations and accommodate the new sidewalk and roadway improvements. The existing bridge on the west of Boggy Terrace drive will also be modified to accommodate the new improvements. The approximate length of the project is 6277.23 feet (1.19 miles) from Osceola Parkway to Boggy Creek Road. The project will include new roadway and sidewalk construction, median width modification, reconstruction of driveways, drainage modification. A new traffic signal will be constructed as part of the project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents