Similar Projects
U-Haul of FSU
New Construction - 37,422 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Tallahassee, FL

Coca-Cola Florida Manufacturing and Distribution Center
New Construction - 1,400,000 SF
Conception
$300,000,000 est. value
Brandon, FL 33511

Studio Works
New Construction - 22,671 SF
Design
$1,950,000 est. value
Hobe Sound, FL 33455

Fort Pierce Self Storage
New Construction - 37,200 SF
Design
$7,500,000 est. value
Fort Pierce, FL 34950

Three Metal Storage Buildings
New Construction
Bidding
$3,000,000 est. value
Rockledge, FL

Cubesmart Self Storage
New Construction - 89,966 SF
Sub-Bidding
$4,435,000 est. value
Coconut Creek, FL 33073

OUC St Cloud Operations and Maintenance Facility
New Construction - 300,000 SF
Post-Bid
Orlando, FL 32800

Climate Controlled Self Storage
Addition - 11,037 SF
Post-Bid
Tallahassee, FL

Development of Waterway Estates Property
New Construction
Results
Fort Myers, FL 33903

Design/Build Public Works Storage Building
New Construction - 4,800 SF
Results
Holly Hill, FL 32117

Public Storage # 25429
New Construction - 194,667 SF
Construction
$15,141,199 est. value
Lake Worth, FL 33463

Sawgrass Storage Fka Parrish Lakes Storage
New Construction - 88,331 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Parrish, FL 34219

Retail Center at County Line Road
New Construction - 155,000 SF
Pending Verification
Spring Hill, FL

Destin Water Users
New Construction
Pending Verification
Destin, FL

Scannell Industrial Park - Beachwalk North
New Construction - 4,390,000 SF
Conception
$10,000,000 CJ est. value
Saint Augustine, FL 32095

Last Updated 06/01/2022 02:10 PM
Project Title

Biotech Warehouses

Physical Address View project details and contacts
City, State (County) Bradenton, FL 34203   (Manatee County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method
Project Status Construction Commenced September 2021, Construction Completion Expected December 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

50,892 SF - Warehouse/Storage, 17,636 SF New Construction, Warehouse/Storage, 16,490 SF New Construction, Warehouse/Storage, 16,766 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents