Similar Projects
New Stadium
New Construction
Conception
Rio Grande City, TX

Vincent Beck Stadium Renovation
Renovation
Conception
$17,500,000 est. value
Beaumont, TX 77705

R.E. St. John Stadium - 2021 Bond - Kilgore Independent School District
Renovation
Design
$4,000,000 CJ est. value
Kilgore, TX 75662

Gameday Sports Complex
New Construction, Infrastructure - 85,290 SF
Design
$10,500,000 CJ est. value
McKinney, TX 75071

Shotwell Stadium Press Box
New Construction, Infrastructure
Post-Bid
$8,200,000 CJ est. value
Abilene, TX 79602

Richard R. Flores Stadium Structural Repair
Renovation
Post-Bid
$400,000 est. value
Edinburg, TX 78539

Tom Landry Stadium Civil and Structural Repairs
Results
$1,200,000 est. value
Mission, TX 78572

Pecos HS Stadium Renovations
Renovation
Results
$10,600,000 est. value
Pecos, TX

World Heritage Center
Infrastructure, Renovation
Construction
$9,300,000 CJ est. value
San Antonio, TX 78214

JMK5 Arena
Renovation - 300,000 SF
Construction
$18,000,000 CJ est. value
La Marque, TX 77568

Middle School #4 - 2021 Bond - Proposition A - Rockwall Independent School District
Renovation
Pending Verification
$43,000,000 CJ est. value
Rockwall, TX 75087

Pan American Complex - VC09 - City of Dallas
Renovation
Pending Verification
$3,480,000 CJ est. value
Dallas, TX 75210

W.F. Lockett Stadium Upgrades
Renovation
Conception
$3,500,000 est. value
Jefferson, TX 75657

Lubbock County Expo Center
New Construction, Infrastructure - 440,000 SF
Design
$120,000,000 CJ est. value
Lubbock, TX 79403

RFQ Construction Manager-at-Risk - Bobcat Stadium End Zone Complex Expansion for Texas State University
Renovation
Post-Bid
$24,000,000 CJ est. value
San Marcos, TX 78666

Last Updated 05/22/2023 11:05 AM
Project Title

UT SEZ 7W Toilet Room Renovation / DKR Texas Memorial Stadium

Physical Address View project details and contacts
City, State (County) Austin, TX 78712   (Travis County)
Category(s) Entertainment/Recreation
Sub-Category(s) Stadium
Contracting Method Competitive Bids
Project Status Construction start expected June 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans consist of a renovation to the existing toilet room for suite 7W within the south end zone. As of May 22, 2023, this project is in construction documents. Construction is anticipated to begin around June/July 2023.

Details

165 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents