Similar Projects
WPCP Digester Feed & Piping Improvements
Bidding
Fort Wayne, IN

New Water Treatment Plant and Well No. 5
Bidding
Lagrange, IN 46761

Monroe WTP Residuals Pumping Improvements
Post-Bid
Bloomington, IN 47401

Grit Dewatering Improvements
Post-Bid
Gary, IN 46401

Wastewater Treatment Plant Improvements
Results
Bedford, IN 47421

Wastewater System Improvements and Septic Relief
Results
Huntington, IN 46750

Virgin Granular Activated Carbon
Post-Bid
Hammond, IN

WWTP Clarifier Rehabilitation
New Construction, Demolition
Results
South Bend, IN 46601

2020 Wastewater Treatment Improvements
Post-Bid
Glenwood, IN

Water Pollution Control Plant Trim Blower Improvements
Results
Fort Wayne, IN

Jasper Regional Water District (NORWEJ) Water Supply and Treatment Plant No. 2
Post-Bid
DeMotte, IN 46310

WPCP Dechlorination Injection Improvements
Results
Fort Wayne, IN 46803

Indiana Harbor and Canal Confined Disposal Facility Wastewater Treatment Plant
Post-Bid
$1,000,000 to $5,000,000 est. value
East Chicago, IN 46394

Water Utility Improvements - Division A - WTP and Well Improvements
Results
Less than $2,360,000 est. value
La Crosse, IN

Aqua Avon WWTP Expansion Phase VI
Post-Bid
Avon, IN 46123

Last Updated 12/30/2020 04:09 PM
Project Title

Wastewater System Improvements

Physical Address View project details and contacts
City, State (County) Terre Haute, IN 47876   (Vigo County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $851,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work includes approximately 1,970 linear feet of sanitary sewer replacement, 900 linear feet of sanitary sewer rehabilitation through Cured-in Place Pipe (CIPP), sanitary sewer point repairs, as well as all site and pavement restoration, maintenance of traffic, erosion control, dewatering, and all other ancillary work required to complete the project as generally designed

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents