Similar Projects
Last Updated | 09/21/2023 03:33 AM |
Project Title | Final Effluent Pump No. 5 Rebuild at South Shore Water Reclamation Facility |
Physical Address | View project details and contacts |
City, State (County) | Oak Creek, WI 53154 (Milwaukee County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $256,709 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of rebuilding Final Effluent Pump No. 5 at the South Shore Water Reclamation Facility. The scope of work shall include the following:.. Disconnect and remove the right angle drive and external heat exchanger from the pump mounting plate. Remove the pump from the wet well in its entirety. Ship the pump to the Original Equipment Manufacturer (OEM) to perform the rebuild scope as defined in Specification Section 3.0 of this Contract. Install the rebuilt pump in the wet well and connect discharge flange with new flange gaskets. Install the right angle drive to the pump and the drive shaft to the right angle drive and motor. The Contractor shall follow the manufacturer's alignment specifications for installation. Reconnect the lubrication oil heat exchanger and oil lines. Complete 7-day test run. Complete all other work described in the specifications and as necessary to complete the project. The Owner has a goal of 20% participation by small, women and minority business enterprises for this contract. If you have questions contact Nathan Churchill at nchurchill@mmsd.com 20% of the total contract price (13% MBE, 2% WBE, 5% SBE/VBE) |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |