Similar Projects
Breeden Drainage Improvements Phase 1A
Infrastructure
Bidding
$1,854,000 est. value
San Antonio, TX

Jo Marie Area Drainage Improvement
Infrastructure
Bidding
$2,627,000 est. value
TX

Seeling Channel Phase 3 Project
Post-Bid
$15,080,000 est. value
San Antonio, TX 78205

Construction of Johnson Ranch North Unit 9 Public Water, Wastewater, Paving and Drainage Improvements and Johnson Ranch North Unit 9 Private Paving and Grading Improvements
Post-Bid
San Antonio, TX

OP Schnabel Park Entrance and Bridge
Results
$783,000 est. value
San Antonio, TX

Underground Storm Drain Video Inspection Program
Results
Less than $4,250,000 est. value
San Antonio, TX 78205

Construction of Streets, Drainage, Water, and Wastewater for Somerset Grove Unit 1
Post-Bid
San Antonio, TX 78200

2020 Street and Drainage Maintenance Project
Results
$120,000 to $150,000 est. value
Olmos Park, TX 78212

Olmos Park FY 2020-2021 Street and Drainage Maintenance
Post-Bid
Olmos Park, TX

Construct 3 Low Water Crossing Improvements On Bent Oak Dr., Chimney Rock Ln. And Windmill Rd
Results
Shavano Park, TX 78231

Redbird Ranch Phase 2 Unit 1M-3 and Unit 3M-3A
Post-Bid
TX 78253

Z--IDIQ for Stream Gage Site Rprs, Oklahoma and Texas
Results

Repair Storm Drainage at The Medical Education Training Campus (METC).
Post-Bid
$500,000 to $1,000,000 est. value
San Antonio, TX 78275

SECO Creek Headgate Project
Results
San Antonio, TX 78215

2020 Streets and Drainage Improvement Project
Infrastructure
Post-Bid
$7,527,271 est. value
San Antonio, TX

Last Updated 09/10/2021 09:42 AM
Project Title

Government Canyon Stream Restoration

Physical Address View project details and contacts
City, State (County) San Antonio, TX   (Bexar County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of furnishing all labor, materials, services, equipment and appliances required with, or properly incidental to all construction required to complete the project above. The contractor will be responsible for constructing a log roller system to restore the head cut, channel grading, bank establishment, and planting native seeds and ensuring their growth.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents