Similar Projects
John F. Kennedy International Airport - Interim Rehabilitation of Taxiway C
Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
Queens, NY 11430

Runway 6-24 Rehabilitation
Infrastructure
Bidding
Fulton, NY 13069

Exit Lane Monitors at Greater Rochester International Airport
Term Contract
Post-Bid
Rochester, NY 14624

Jamestown Airport Runway 7-25 Rehabilitation
Post-Bid
Jamestown, NY 14701

Watertown International Airport Runway 7-25 and Intersection Rehabilitation Project
Results
Watertown, NY 13601

North Apron Reconstruction
Results
Ghent, NY 12075

Skaneateles Aerodrome Runway 10 Safety Improvements 2020
Construction
Skaneateles, NY 13152

Taxiway A Rehabilitation - Phase III - TW - A, D and GA Apron
Post-Bid
Ithaca, NY 14850

Oneonta Municipal Airport Terminal Apron Reconstruction
Results
Oneonta, NY 13820

Aircraft Parking Apron Concrete Repairs
Term Contract
Post-Bid
$100,000 to $250,000 est. value
Newburgh, NY 12550

Repair Airfield Pavements
Results
$1,000,000 to $5,000,000 est. value
Syracuse, NY 13211

Liquid Runway Deicer
Infrastructure
Post-Bid
Ronkonkoma, NY 11779

Parallel Taxiway H and K at Greater Binghamton Airport
Results
Johnson City, NY 13790

Tri-Cities Airport Rehabilitate Taxiway A Including Access Stub Taxiways B, C, D, and E
Infrastructure
Post-Bid
Endicott, NY 13760

Runway 17-35 Rehabilitation - Phases II-IV at Plattsburgh International Airport
Results
Less than $12,500,000 est. value
Plattsburgh, NY 12903

Last Updated 01/25/2022 07:19 AM
Project Title

BNIA - Rehabilitation and Reconstruction of Runway 5-23

Physical Address View project details and contacts
City, State (County) Cheektowaga, NY 14225   (Erie County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $26,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project work provides for the rehabilitation and reconstruction of the portion of Runway 5-23 between Taxiway E and the Runway 23 end; including the runway intersection; Runway 23-end blast pad; runway shoulders; Taxiway A between Taxiway E and the Runway 23-end, and connector Taxiways B, C, and V; rehabilitation of Taxiway D pavements within the Runway 5-23 RSA; total replacement of the inpavement runway centerline and Touch Down Zone (TDZ) lights with new LED inpavement lights; total replacement of runway edge lights with new LED High Intensity Runway edge lights; removal and replacement of non-standard size 2 airfield guidance signs with new size 3 LED lighted signs, with accommodations for future renaming conventions for the connecting taxiways; and installation of new Runway Guard Lights (RGL’s) on both Runway 5-23 and Runway 14-32. Concurrent with the pavement work, associated work includes; storm drainage and underdrain installation, electrical vault modifications, taxiway centerline light installation, taxiway edge light replacement, and replacement of the RWIS system.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents