Similar Projects
2022 Quaker Valley Culvert Reconstruction Project
Infrastructure
Design
Farmington Hills, MI

City Hall Campus Parking Lot Replacement
Infrastructure
Design
Farmington Hills, MI 48336

City Hall Campus Parking Lot Replacement Project
Bidding
Less than $298,362 est. value
Farmington Hills, MI

0.97 Mi of Concrete Road Reconstruction, Concrete Curb, Gutter, Sidewalk and Ramps, Water Main, Pedestrian Signal, Signing and Pavement Markings
Infrastructure
Bidding
Farmington Hills, MI

2020 Safety Path Program
Post-Bid
MI

Rest Area ADA Improvement Eastern Lower Peninsula
Post-Bid

Public Safety Campus Expansion, Phase II
Results
Walled Lake, MI

Public Safety Campus Expansion, Phase II
Results
Walled Lake, MI

Richardson Center Sidewalks
Alteration
Bidding
$75,000 est. value
Commerce Township, MI

Bike Racks for Sidewalks
Post-Bid
Wixom, MI

Restoration and Preservation of Hunter House - Drainage and Masonry
Results
Birmingham, MI

Orchard Lake Road over Tributary to Rouge River
Infrastructure
Bidding
MI

Woodland Elementary Sidewalk Replacement
Post-Bid
Auburn Hills, MI

Sashabaw Regional Drain Maintenance
Results
Clarkston, MI 48346

Pedestrian Crossing At Adams Road And Marketplace
Alteration
Bidding
Rochester Hills, MI

Last Updated 01/27/2022 11:23 PM
Project Title

2022 Green Infrastructure Improvements at Pioneer Park

Physical Address View project details and contacts
City, State (County) Royal Oak, MI 48073   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of furnishing all labor, materials, equipment, and incidental items including but not limited to the following items: Earth excavation and grading. Drainage structures and piping. Rain garden soil mix, plantings and bark mulch. Sidewalk and curbing. Topsoil and seed restoration. Fencing.

Details

Division 01 - General Requirements, Temporary Barriers and Enclosures, Temporary Fencing.
Division 31 - Earthwork, Grading, Finish Grading, Spreading and Grading Topsoil, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents