Similar Projects
Ladue Middle School
Renovation
Post-Bid
Saint Louis, MO 63124

Washington MS, Four Rivers Career Center Nurse Simulation Lab
Renovation, Addition
Post-Bid
Washington, MO 63090

Disaster Recovery Services
Results

Disaster Recovery Services
Results

Fordland Bond Projects
Renovation, Addition
Post-Bid
Fordland, MO 65652

Senior High School 'C' Building
New Construction
Results
Sikeston, MO 63801

Elementary & High School Classrooms
Addition - 5,425 SF
Post-Bid
Silex, MO 63377

Kirkwood High School (KHS) Security Office Renovations Project 2021
Renovation
Results
Kirkwood, MO 63122

Congress Middle School 2021
Renovation
Post-Bid
Kansas City, MO

Waynesville MS Phase III - Parker Fine Arts Building
Renovation, Addition
Results
Waynesville, MO 65583

Monett Middle School, Security Upgrades and Improvements
Renovation
Post-Bid
Monett, MO 65708

Jefferson Middle School
Renovation, Addition
Results
Columbia, MO 65201

Bernard Campbell School
Renovation, Addition
Post-Bid
Pleasant Hill, MO

Holcomb R-3 FEMA Safe Room
New Construction
Results
Holcomb, MO 63852

Ritenour High School Toilet Room 211
Renovation
Post-Bid
Saint Louis, MO 63114

Reported 12/16/2021 12:00 AM
Project Title

Construction Manager at Risk for Grandview C-4 School District

Physical Address View project details and contacts
City, State (County) Grandview, MO 64030   (Jackson County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Grandview C4 School District is in search of qualified firms to provide a full range of services as Construction Manager at-Risk (CMR) during the planning, design, renovation and construction at District location. On November 30, 2021 the information for this RFQ may be found on the District’s website www.grandviewc4.net. At the District’s Home Page, select: Department, Finance, and then select RFPs and Bids. Sealed responses to the RFQ clearly marked with the RFQ title must be received by 10:00 a.m. on Wednesday, December 15, 2021 in the Grandview C-4 School District Central Office, located at 13015 10th Street, Grandview, MO 64030

Details

Middle/Senior High School, Renovation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents