Similar Projects
City Hall Windows - Air Seal Replacements - 563 - City Of La Crosse
Renovation
Conception
$600,000 CJ est. value
La Crosse, WI 54601

City Hall Renovation - 25 FAC CTYHL - City of Oshkosh
Renovation
Conception
$18,000,000 CJ est. value
Oshkosh, WI 54901

Waukesha County Courthouse Project Step 2 - Renovate 1959 Courthouse
Renovation
Design
$58,600,000 est. value
Waukesha, WI 53188

Remodel - 5th Floor - City Hall - City of La Crosse
Build-out
Design
$700,000 CJ est. value
La Crosse, WI 54601

Waukesha County Courthouse Step 2 Additions and Renovations
Renovation
Bidding
$89,300,000 CJ est. value
Waukesha, WI 53188

Courthouse Probate Vault Alteration
Renovation
Bidding
$150,000 CJ est. value
Janesville, WI 53545

City Hall Improvements
Renovation
Post-Bid
Hudson, WI 54016

Manitowoc County Courthouse Restroom Remodel
Renovation
Post-Bid
Manitowoc, WI 54220

Customer Service Counter Modifications - Oshkosh City Hall
Renovation
Results
Oshkosh, WI 54901

Multi-Department Remodel
Renovation
Results
Chippewa Falls, WI 54729

Rusk County Government Center Remodel
Build-out
Design
$5,458,700 CJ est. value
Ladysmith, WI 54848

Vilas County Land & Water Office
Build-Out - 744 SF
Post-Bid
Eagle River, WI 54521

Trempealeau County Justice Center - Bid Package 2
New Construction
Results
Whitehall, WI 54773

Public Safety Building
New Construction - 60,000 SF
Post-Bid
$16,300,000 est. value
McFarland, WI

Door County Highway Department Brine Facility
New Construction - 350 SF
Results
Sturgeon Bay, WI 54235

Last Updated 02/22/2023 12:47 PM
Project Title

Village Hall Renovation

Physical Address View project details and contacts
City, State (County) Sauk City, WI 53583   (Sauk County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $78,450 [brand] Estimate
Plans Available from Architect - 01/10/23
Owner View project details and contacts
Architect View project details and contacts
Description

For the construction of Village Hall Renovation PROJECT is for renovation and improvements to the existing Sauk City Municipal Building located at 726 Water Street, Sauk City, Wisconsin. Exterior improvements include EPDM reroofing, new mansard roofing, a new entrance facade feature, some new windows, elevated riverside deck, and other associated site improvements. The interior remodeling is focused to the 5,000 SF upper floor with new flooring, ceilings and partitions to create a new lobby space, restroom and Village Board Room and other associated building improvements. The Village administration operations will relocate to the lower floor during construction and public access to that area shall be maintained. PROPOSED SCHEDULE is as follows: Project Award is scheduled for February 14, 2023, and Final Completion by December 2023. PLANHOLDERS LIST will be updated interactively on our web address at portal under Bids. No proposal will be accepted unless accompanied by a bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. BIDDER is required to deliver the original bid bond within the 72 hours of bid opening to MSA Professional Services, Inc., Attn: Carter Arndt, 1230 South Boulevard, Baraboo, WI 53913. The bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the bid bond shall be forfeited to the OWNER as liquidated damages. Performance and Payment Bonds for the full contract amount shall be required from the successful Bidder after award. Prequalification of bidders will not be required. Bidders to whom award of a Contract is under consideration shall submit to Architect, upon request, a properly executed AIA Document A305 Contractor's Qualifications Statement. No bidder may withdraw his bid within 30 days after the actual date of the opening thereof. Owner reserves the right to reject any or all bids, waive or not waive any informalities in the bids received, and to accept any proposal which they deem most favorable to the interests of the Owner. Published by the authority of the Village of Sauk City.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents