Similar Projects
Last Updated | 02/26/2021 10:48 PM |
Project Title | Cable Guiderail Installation at various locations on I-59 from a point southwest of the Greene County Line (MP 55.209) to 0.250 mile south of the 3rd Avenue East Overpass in Tuscaloosa |
Physical Address | View project details and contacts |
City, State (County) | Tuscaloosa, AL (Greene, Tuscaloosa Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Highway Signs/Guardrails/Barriers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $735,332 to $898,739 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For Constructing the Cable Guiderail Installation at various locations on I-59 from a point southwest of the Greene County Line (MP 55.209) to 0.250 mile south of the 3rd Avenue East Overpass in Tuscaloosa. Length 17.045 mi. 210D021 10 CUYD Borrow Excavation (Loose Truckbed Measurement)(A4 or Better) 600A000 1 LS Mobilization 624A000 33,876 LF Cable Guiderail 624B000 32 Each Cable Guiderail Anchor 631C010 938 LF Guardrail Reset 654A001 83 SQYD Solid Sodding (Bermuda) 665Q002 30 LF Wattle 698A000 1 LS Construction Fuel (Maximum Bid Limited to $ 23,000.00) 728A000 1 Each Truck Mounted Impact Attenuator Unit 740B000 1,904 SQFT Construction Signs 740D000 200 Each Channelizing Drums 740E000 150 Each Cones (36 Inches High) 740M001 150 Each Ballast For Cone 741C010 1 Each Portable Sequential Arrow And Chevron Sign Unit 742A001 2 Each Portable Changeable Message Sign, Type 2 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |