Similar Projects
Historic County Courthouse
Renovation
Conception
Provo, UT 84601

Administration Building
Renovation
Conception
Provo, UT 84606

Downtown City Hall Redevelopment
Design
Provo, UT 84606

City Hall Renovation
Renovation - 60,000 SF
Design
West Jordan, UT 84088

Grand County Courthouse Boiler Room Update/Redesign
Renovation
Bidding
$200,000 CJ est. value
Moab, UT 84532

DFCM Construction Pre-Qualified General Ogden Courthouse Exterior Main Entrance Remodel
Build-out
Bidding
$257,000 CJ est. value
Ogden, UT 84401

Courtroom Gallery Expansion
Addition
Post-Bid
Brigham City, UT 84302

Construction Management and General Contractor Preconstruction - Millcreek City Hall
New Construction
Post-Bid
Millcreek, UT

Construction Manager as Constructor (CMC) Services - Frank E. Moss Courthouse Seismic Upgrades, Backfill, & Building Renovation
Renovation
Results
$75,000,000 to $90,000,000 est. value
Salt Lake City, UT

Construction of Honeyville City Hall
New Construction
Results
Honeyville, UT 84314

Cannonville Town Hall and Medical Center Addition
Addition - 3,475 SF
Construction
Cannonville, UT

Construction Management/General Contractor (CM/GC) Services for a New Santaquin City Hall
New Construction
Construction
Less than $6,000,000 est. value
Santaquin, UT 84655

Security Center Complex
New Construction, Renovation
Conception
Spanish Fork, UT 84660

AOC Manti Sixth District Courthouse
New Construction - 27,000 SF
Design
$13,107,870 est. value
Manti, UT 84642

St. George Courthouse 3rd Floor Build-out
Renovation - 9,500 SF
Post-Bid
$40,000 est. value
Saint George, UT 84770

Last Updated 08/23/2022 12:31 AM
Project Title

Courts - City Of Orem

Physical Address View project details and contacts
City, State (County) Orem, UT 84058   (Utah County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids
Project Status Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $298,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined. As of August 23, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents