Similar Projects
St. Francis Barracks Seawall, Shoreline Erosion Protection, CAP Section 14, St. Johns County, Florida
Post-Bid
FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Coastal Storm Risk Management Project, South Ponte Vedra and Vilano Beach, St. Johns County, Florida
Results
$20,000,000 to $30,000,000 est. value
FL

Design-Build Services for Hurricane Matthew FEMA Cat. B Emergency Berm Restoration
Results
Less than $11,584,996 est. value
FL

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Marsh Flow-Way C1 and C2 Maintenance Improvements
Results
Less than $1,760,000 est. value
FL

St. Francis Barracks Seawall, Shoreline Erosion Protection, CAP Section 14
Term Contract
Post-Bid
$500,000 to $1,000,000 est. value
Saint Augustine, FL 32084

Side Drain Replacement
Results
Less than $250,000 est. value
FL

Kings Estate Road Drainage Improvements - HMGP 4283-44-A
Results
Less than $337,216 est. value
FL

Fellsmere Grade CS2 Sliplining
Results
Less than $175,000 est. value
FL

South Orange Street Drainage Improvements
Results
Less than $530,000 est. value
FL

Minor Water Control Structure Rehab
Results
Less than $300,000 est. value
FL

Maintenance Services for Elkton Canal
Results
Elkton, FL 32033

Side Drain and Cross Drain Pipe Replacement
Results
Less than $250,000 est. value
FL

Elkton Canal Cleaning and Grading
Results
Saint Johns, FL

Last Updated 01/20/2022 09:30 AM
Project Title

SJ-14 Weir Replacement

Physical Address View project details and contacts
City, State (County) FL   (Saint Johns County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Located about 1.5 miles west of the ICWW, just west of the intersection of Davis Park Road and Nocatee Parkway in St. Johns County 1. Excavation of a portion of the earthen embankment to remove/replace buried piping. 2. Fabrication and installation of three steel box weirs. 3. Installation of 3 ft thick concrete foundation for steel box weirs and associated foundations of walkway footers. 4. Fabrication and installation of aluminum access walkway structure. 5. Installation of fusion-welded HDPE piping including all piping, fittings, and pipe hold-down footers. 6. Reconstruction of the earthen embankment, grading, grassing, and other associated work

Details

Division 02 - Existing Conditions.
Division 03 - Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Roadway Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents