Similar Projects
Environmental Services IDIQ
Design

Environmental Services IDIQ
Design

Annual Contract - Asbestos Abatement
Term Contract
Bidding
FL

Environmental Water Monitoring Services
Term Contract
Post-Bid
Kissimmee, FL 34741

Analytical Laboratory Services
Term Contract
Post-Bid
Fort Pierce, FL 34945

2019 Apartment Emergency Rehabilitation Services
Renovation
Results
Less than $1,700 est. value
Ocala, FL 34471

Laboratory Analysis and Sampling
Results
De Land, FL 32720

Asbestos Abatement
Post-Bid
Jacksonville, FL 32208

Environmental Sample Analysis
Results
Fort Lauderdale, FL 33351

Asbestos Bulk Analysis and Air Sample Testing
Term Contract
Post-Bid
Less than $20,000 est. value
Tampa, FL 33601

Asbestos Survey at 11800 US 27 South
Results
Sebring, FL 33876

9 Harrison Avenue Asbestos Abatement
Post-Bid
Panama City, FL 32401

Lead Based Paint Assessments
Term Contract
Results
Sunrise, FL 33351

MLK Recreation Center Asbestos Abatement and Flooring Removal
Post-Bid
Panama City, FL 32401

Various Residential/Commercial Lot Cleanup Abatement Projects
Results
Pensacola, FL

Reported 04/27/2021 12:00 AM
Project Title

April Mold Remediation

Physical Address View project details and contacts
City, State (County) Gainesville, FL 32641   (Alachua County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $35,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide mold remediation services. Contractors may bid on any or all of the work sites. 1. The work area shall include the entire unit. 2. Set up negative air filtration. 3. Clean - remediate all mold contaminated building material. 4. Micro-clean all walls, ceilings, and surfaces. HEPA vacuum and damp wipe with anti - microbial cleaning solution. 5. After the contractor completes the mold remediation GHA will contract with a third party, independent contractor to conduct a post remediation inspection and testing of the unit. 6. GHA will authorize contractor payment after the successful completion of post remediation inspection and testing of the unit.

Details

Division 02 - Existing Conditions, Mold Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents