Similar Projects
Highspire Terminals Parking Expansion
Conception
Middletown, PA 17057

JLG Industries - Land Development
Addition
Design
Greencastle, PA 17225

River Pointe Logistics Park
New Construction - 65,000,000 SF
Design
$10,000,000 CJ est. value
Mount Bethel, PA 18343

New Borough Administration, Police and Community Center - All Site Work
New Construction
Bidding
Trainer, PA 19061

Maia's Meadows - Infrastructure
New Construction
Post-Bid
Etters, PA 17319

Humboldt Industrial Park North
New Construction
Post-Bid
Hazleton, PA 18201

Phase 1 Site Improvements
Results
Cresson, PA

Ohara Elementary School Site Improvements
Results
Pittsburgh, PA 15238

Susquehanna Union Green - Sitework
New Construction - 496,148 SF
Construction
Harrisburg, PA 17110

New Jersey Central Railroad Train Station Improvement
New Construction - 32,000 SF
Construction
$1,200,000 est. value
Wilkes-Barre, PA 18704

Lower Allen Commons
New Construction
Design
Lower Allen, PA 17011

Penn Estates Roadway Paving/Roadway Repairs
Renovation
Post-Bid
East Stroudsburg, PA 18301

Fox Chapel Area High School Site Improvements Project
Results
Pittsburgh, PA 15238

The Mill at Easton Phase I & II
New Construction - 27,000 SF
Construction
$10,000,000 est. value
Easton, PA 18042

Authority Wide Site Improvements
Post-Bid
Pittsburgh, PA 15219

Reported 11/18/2020 12:00 AM
Project Title

On-Call Drilling

Physical Address View project details and contacts
City, State (County) (Washington, Westmoreland Counties)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

(a) General – This work consists of moving from the driller’s equipment yard to the drilling site with all necessary equipment, tools and materials necessary to move to and between borings and complete work required under the Purchase Order, and removal of equipment, tools, and excess materials from the drilling site at the completion of work. (b) Movement between borings at the job site are not considered mobilization, but is to be included in the per foot price for advancing the boring. (c) Mobilization will be paid as “Each”, within District 12-0 (d) Mobilization will be paid as “Each”, from one job site to another.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents