Similar Projects
New Pump Station
New Construction
Conception
$974,500 est. value
Waterloo, WI

Pumping Station 4 Rehabilitation
Post-Bid
Madison, WI

Big Buck Lift Station Improvements Phase I
Post-Bid
Kenosha, WI 53142

Sanitary Sewer Pump Station - Frame Park Restroom
Results
Waukesha, WI 53188

Mannville Lift Station Replacement
Renovation
Results
Marshfield, WI 54449

Lift Stations 1 & 10 Generator Buildings
Renovation
Post-Bid
$345,000 est. value
Pewaukee, WI 53072

Lift Station No. 3 Improvements
New Construction
Results
$625,000 est. value
Wind Lake, WI 53185

SMU Lift Station Replacement
Post-Bid
New Franken, WI

Tiedeman Pond Lift Station Upgrades
Results
$600,000 est. value
Middleton, WI

Pump Station 17 Rehabilitation and Force Main Relief Phase 2
Renovation, Infrastructure
Post-Bid
Verona, WI

Museum Place Storm Lift Station
Results
Green Bay, WI

Landfill Lift Station Modifications
Renovation
Post-Bid
Appleton, WI 54911

Greenville STH 76 - Force Main and Lift Station No.1 and No.2 Improvements, Contract I-20
Results
Greenville, WI 54942

CTH V (Long Coulee Road) Utility
New Construction, Infrastructure
Post-Bid
Holmen, WI

Lift Station No. 1A and Water Transfer Station
New Construction
Results
Somers, WI

Last Updated 03/25/2022 08:26 AM
Project Title

Hospital Utility Extension Lift Station 16

Physical Address View project details and contacts
City, State (County) Cumberland, WI   (Barron County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of providing all labor and material for the construction of a sanitary sewer lift station and associated work.

Details

Lift and Pump Stations, Addition.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents