Similar Projects
Design-Build HVAC Animal Services Building Project
Alteration
Bidding
$150,000 est. value
Gainesville, FL 32609

Gainesville High School - Building 20 HVAC Renovation
Renovation, Alteration
Bidding
Gainesville, FL 32609

J041--Refurbish Air Handler Units
Post-Bid
Gainesville, FL

HVAC and Mechanical Products
Term Contract
Post-Bid

Heating, Ventilation and Air Conditioning (HVAC) Replacement - North Region
Results

HVAC Air Filtration Services
Term Contract
Results
FL

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

HVAC Replacement/Installation
Results
Gainesville, FL 32609

H341--Clean Air Handling Units (AHUs) and Heat Recovery Units
Post-Bid
Gainesville, FL

Air Handling Unit Replacement at Fine Arts D
Results
Gainesville, FL 32601

Microbiology Re-Roof and Exhaust Fan Replacement - Phase 1
Post-Bid
Gainesville, FL 32603

4120--Vertical AC Units
Results
Gainesville, FL 32608

Oak Park HVAC Replacement
Post-Bid
Gainesville, FL

HVAC Water Systems Treatment (District-Wide)
Results
Alachua, Gainesville, High Springs, Newberry, FL

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Last Updated 10/20/2021 02:47 PM
Project Title

4120--REPLACE HRU-1 HEAT WHEEL Tiered Evaluation

Physical Address View project details and contacts
City, State (County) Gainesville, FL 32608   (Alachua County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: • Coordinate all work with the specified point of contact (POC) • Deliver all required tools, materials, and parts to the jobsite in H601-1-GV • Ensure that HRU-1 is shut down and locked out • Disconnect electrical connections to existing heat wheel • Remove and dispose of existing heat wheel. • Install new heat wheel and wiper seals. • Connect electrical service to new heat wheel – provide and install any required conduit, wire or disconnects necessary • Conduct start-up and commissioning of the new heat wheel • Perform the work on 1 st shift (0800-1630) • Contractor will remove all construction debris from site and preform proper cleanup. • Provide a summary report of all findings and repairs to the POC.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents