Similar Projects
Last Updated | 08/10/2022 02:31 AM |
Project Title | RFP - Mechanical - Engineering - Plumbing On-Call Services |
Physical Address | View project details and contacts |
City, State (County) | Santa Ana, CA 92701 (Orange County) |
Category(s) | Education, Professional Services |
Sub-Category(s) | Elementary School, Engineering, Middle/Senior High School |
Contracting Method | Competitive Bids |
Project Status | Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Rancho Santiago Community College District is seeking a proposal from your firm ("Consultant") to provide as-needed, on-call Mechanical-Engineering-Plumbing services for a variety of projects throughout the District. The District is in need of mechanical, electrical, and plumbing, collectively referred as "MEP", on-call engineering services for a variety of projects ranging from new construction, alterations, improvements, renovations, tenant improvements, engineering studies, independent engineering audits, energy/sustainability assessment and studies, and engineering forensics. The District has a large diversity of projects ranging from maintenance projects, capital outlay projects, federally-funded grant projects, local and statewide bond projects, energy projects, and facility modification requests. Scope of Work and Deliverables: On an as-needed basis, the District is in need of having available a MEP Consultant to enable the District to respond quickly when there are immediate services that need to occur. The scope of work could consist of the following depending on the type of project and/or task: Mechanical HVAC upgrades/replacements, air distribution assessments, VAV upgrades/replacements, central plant cooling analysis, thermal energy storage analysis, lab exhaust fan systems, ventilation studies, temperature control and thermal comfort studies, building automation, fire protection, air distributions studies, lab-tracking systems, fume hood exhaust systems, fire suppression, and fire sprinkler systems. Electrical Electrical power conditioners, quality of power assessments, generator design, computer UPS design, interior and exterior lighting, security system infrastructure design, telecommunication infrastructure, daylighting, interior/exterior lighting solutions, fire alarm systems, interior/exterior photometric analysis, electrical service one-line diagrams, metering analysis and load verification/studies, building automation system analysis for building comfort and efficiency, equipment assessments and replacement recommendations, low voltage technologies, and electric vehicle electrification. Plumbing Commercial domestic water and hot water systems, central chiller plant design, electrical heating studies, storm water systems, storm water pre-treatment systems, deionized water systems, commercial plumbing systems , compressed air equipment and pipe design, natural gas piping, vacuum systems, boiler systems, plumbing fixtures replacements and upgrades, fire water infrastructure, waste and vent systems, acid neutralizing pre-treatment systems, sump pump and sewage ejector lift stations, and grease waste systems, capacity or fixture count studies, and natural gas requirements. Specialty Services Energy/sustainability design, natural gas conversation to electrical heating, utility analysis, equipment lifecycle cost analysis, energy modeling, and other specialty MEP engineering services as needed by the District. Deadline for Consultants to submit questions regarding this RFP July 6, 2022 by 5:00pm District to interview Consultant(s) (Optional) July 18, 2022 District to finalize recommendation for District Board of Trustees (if required) August 2022 District Board of Trustees approves successful Consultant (if required) September 2022 All questions must be submitted in writing to FacilitiesRFP@rsccd.edu. The question deadline is indicated in the RFP Schedule above. After this deadline, the District will not answer, address, and/or review any questions interested Consultants might submit. Responses to all questions received prior to the deadline will be provided to all Consultants via addendum. As needed on a project-by-project basis. The method of contractor selection has not been determined at this time. |
||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |