Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Renovate LRS Offices
Renovation
Design
$5,000,000 CJ est. value
Biloxi, MS 39530

Repair Elevators, Multiple Buildings
Renovation
Design
$5,000,000 CJ est. value
Biloxi, MS 39531

Install Geomembrane Liner, Camp Shelby Joint Forces Training Center
Infrastructure
Bidding
$350,000 CJ est. value
Camp Shelby, MS 39401

Construct Restroom in Intel Vault Building 308
Demolition, Renovation, Infrastructure
Bidding
$100,000 CJ est. value
Meridian, MS 39307

Install Fiber Optic Cable on the MPRC, CSJFTC, Camp Shelby
Renovation
Sub-Bidding
$200,000 CJ est. value
Hattiesburg, MS 39401

Replacing Current Telecommunication Systems
Post-Bid
MS

JSUTV Digital Upgrade
Post-Bid
Jackson, MS

Telecommunications
Results
Gulfport, MS 39507

Install Lenel HSPD-12 Compliant Physical Access Control System (ePACS) - Poplarville, MS
Term Contract
Results
Poplarville, MS 39470

Repairs to Battalion Headquarters Building 1703 Camp Shelby Joint Forces Training Center (CSJFTC)
Renovation
Bidding
$700,000 CJ est. value
Camp Shelby, MS 39401

RingCentral Unified Communication System
Term Contract
Post-Bid
Jackson, MS

Desoto-Classroom Audio Systems
Alteration
Results
De Soto, MS

Building 5 Remodel
Build-out
Bidding
$100,000 CJ est. value
Gulfport, MS 39507

Last Updated 08/05/2022 05:33 PM
Project Title

Fiber Optic Cables from HH-0317 to B1114, B1120 and B1130

Physical Address View project details and contacts
City, State (County) Columbus, MS 39705   (Lowndes County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Military Facility, Security/Communications
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE. This SOO defines the requirement for the Contractor to engineer, furnish, install and test (EFI&T) Single Mode (SM) Fiber Optic Cable (FOC) to support connectivity from HH-0317 to B1114, B1120, and B1130 at Columbus AFB MS. 2.0 REQUIREMENTS. 2.1 GENERAL REQUIREMENTS. 2.1.1 Safety Requirements. The contractor shall remain in compliance with all Federal, State, county, and base security and safety laws, regulations, policies, and requirements. 2.1.2 Site Coordination. The Contractor shall meet with the base safety officer immediately upon arrival on site for review of the specific safety requirements prior to installation. 2.1.2.1 Confined Space. The Contractors and Sub-contractors entering spaces on Columbus AFB MS are responsible for the safety of their personnel and for their own permit space program as outlined in AFMAN 91-203. All confined space operations must be coordinated with the Base Safety Office prior to start of work. The primary Contractor is responsible for all Sub-contractor confined space operations. 2.1.2.2 Accident/Incident Reporting and Investigation. The Contractor shall record and report all available facts relating to each instance of injury to either Contractor or Government personnel. Notification shall be provided to the 14 CS/SXCP Project Manager and the Base Safety Office unless otherwise stated in the SOO. The Contractor shall secure the scene of any accident and wreckage until released by the accident investigative authority through the Base POC. If the Government elects to conduct an investigation of the incident, the Contractor shall cooperate fully and assist the Government personnel until the investigation is completed. 2.1.2.3 Work Area(s). At day's end, the Contractor shall remove all debris and surplus materials from the work place. Safety barriers shall be in place to protect unfinished work site at the end of the day. All open holes or trenches shall be completely enclosed by flexible orange construction safety fencing, or other safety barriers, at the end of the work day. Equipment and materials required to complete the work effort may remain on site as long as they are organized/stored in a manner that does not cause a safety hazard. The contractor shall co-ordinate with the 14 CS/SXCP to ensure that any locking manhole covers are put back in place at the end of each workday. 2.1.2.4 Traffic Control. In the event base vehicular traffic is to be disrupted by trenching or horizontal directional boring, the Contractor shall notify the 14 CS/SXCP PM NLT 10 calendar days in advance to inform base Security Forces and Emergency Services personnel of the planned disruptions. GENERAL INFORMATION. 3.1 Period of Performance. The period of performance for the project shall be one (1) year post contract award date. 3.2 Place of Performance. The place of performance is Columbus AFB MS. 3.3 Hours of Operation. The Contractor shall routinely work during normal duty hours of the site. However, mission requirements may necessitate work outside normal hours (nights and/or weekends), especially if existing service must be interrupted. Any site work requested by the Contractor to be performed outside of normal duty hours shall be coordinated with the 14 CS/SXCP and approved by the Contracting Officer at least 10 calendar days in advance. 3.4 Holidays/Down Days. The Contractor shall not perform under this contract on federal holidays or site-unique down-days unless expressly authorized by the CO and coordinated with the base POC. 3.5 Base Support. The Contractor shall identify any base support requirements (for example, laydown and storage areas) necessary to complete this project in their proposal. The contractor shall return all government furnished lay-down and storage areas to their original condition upon completion of the project.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents