Similar Projects
Menards / Bradley
New Construction, Infrastructure - 200,000 SF
Design
$25,000,000 CJ est. value
Bradley, IL 60915

2023 New Maintenance Garage and Renovations
New Construction, Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
Bourbonnais, IL 60914

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Public Works Salt Shed
New Construction
Post-Bid
$90,000 est. value
Kankakee, IL 60901

2022 RLF Concrete Program
Infrastructure
Results
$478,482 CJ est. value
Bradley, IL 60915

New Public Works Facility Bid Package #3 - Site Work
Infrastructure
Results
$332,000 est. value
Manteno, IL

Belson Steel Relocation
Build-Out
Pending Verification
Bourbonnais, IL

2022 Community Center Fieldhouse Addition at Kankakee High School
Addition, Demolition, Infrastructure, Build-out
Post-Bid
$441,000 CJ est. value
Kankakee, IL 60901

New Manteno Public Works Facility - Bid Package 2 - Building and Build-Out
Build-Out - 83,000 SF
Results
$5,000,000 est. value
Manteno, IL

The Group IV Work
Infrastructure
Post-Bid
$1,926,000 CJ est. value
Kankakee, IL 60901

Storm Sewer Slip-lining for River and Tetrault Streets
Infrastructure
Results
$416,900 CJ est. value
Bourbonnais, IL 60914

2022 MFT Street Maintenance Program
Infrastructure
Post-Bid
$400,000 CJ est. value
Kankakee, IL 60901

St. Anne CHSD 302 - High School Athletic Field
New Construction, Infrastructure
Results
$5,209,229 CJ est. value
Saint Anne, IL 60964

West Harbor Residences / Kankakee
New Construction, Infrastructure - 51,308 SF
Post-Bid
$15,000,000 CJ est. value
Kankakee, IL 60901

Resurfacing CH 18
Infrastructure
Results
$1,044,289 CJ est. value
Essex Township, IL 60961

Last Updated 05/06/2023 06:33 PM
Project Title

Construction of a Storage Building

Physical Address View project details and contacts
City, State (County) Bourbonnais, IL 60914   (Kankakee County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Construction start expected May 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bourbonnais Elementary School District #53 is requesting proposals for the construction of a storage building. The Method of Contractor Selection has not been determined at this Time.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents