Similar Projects
CNG Fueling Station Maintenance and Repair
Term Contract
Results
Rochester, NY 14606

Bronson Court Furnace and Water Heater Replacement
Alteration
Post-Bid
$280,000 est. value
Rochester, NY 14608

Pittsford 2020 Capital Improvement Project - Contract 103: Mechanical Contract
Alteration
Results
$160,000 est. value
Pittsford, NY

37 Power Vent Hot Water Heaters
Alteration
Post-Bid
$750,000 est. value
Rochester, NY 14608

Chiller 1 Pumps Replacement - Building 60
Alteration
Results
Rochester, NY 14620

Hot Water Tank Replacement Program
Alteration
Results
Rochester, NY

2021 Capital Improvement Project: Phase 4 - Contract 502: Mechanical Contract
Alteration
Post-Bid
$2,000,000 est. value
Rochester, NY 14618

Domestic Hot Water Heaters
Alteration
Post-Bid
Rochester, NY

Furnish Steam to Water Domestic Hot Water Heaters
Results
Rochester, NY 14614

1095 Replace or Repair Boiler for Building 29 and 66 at Industry Limited Secure Center
Alteration
Post-Bid
$200,000 est. value
Rush, NY 14543

Boiler and DHW Install
Results
Rochester, NY

Four Sites (Lot 1-Lot 4) Radon Mitigation System Installation
Results
Avon, Dansville, Perry, Scottsville, NY 14546

Removal and Replacement of All Tubes in Boilers 1 and 2 in the Main Hospital (Building 60)
Alteration
Results
$60,000 est. value
Rochester, NY 14620

Hartwell Hall Boiler Replacement
Alteration
Results
$800,000 est. value
Brockport, NY 14420

Preventive Maintenance of Chillers and Ancillary Equipment
Alteration
Post-Bid
Rochester, NY 14620

Last Updated 06/29/2022 09:25 AM
Project Title

Tower Fine Arts Chiller Replacement

Physical Address View project details and contacts
City, State (County) Brockport, NY 14420   (Monroe County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove the existing York Millennium liquid chiller system and all associated components. This includes, but is not limited to: Chiller, CHWS/R piping, ... Removal and reinstallation of existing ductwork and other building systems for installation of the new chiller. Provide a new chiller system and associated pipping as shown on the contract drawings. Provide all associated control system and mechanical / electrical equipment tie-ins. The system must be operational by May 1st, 2023.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Packaged Water Chillers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents