Similar Projects
Henderson Hall Bio-Tech Laboratories
New Construction, Renovation - 4,320 SF
Bidding
Tuskegee, AL 36083

Skate Park Restroom Modifications
Renovation
Bidding
Gulf Shores, AL

Construction of the Stoney Lonsesome OHV Park - Truck Wash and Bath House Facilities
Post-Bid
Arkadelphia, AL 35033

Dinius Park
Post-Bid
Auburn, AL 36830

On-Going Bathroom Renovations
Renovation
Results
Phenix City, AL 36867

Toilet Building Renovation for Forestdale Community Park
Renovation
Results
Forestdale, AL 35214

Gulf State Park - Bath House Repairs and Upgrades
Construction
Less than $1,294,500 est. value
Fort Morgan, AL 36542

Daphne Tennis Center and Restroom Facility at Lott Park
New Construction
Post-Bid
Daphne, AL

Restroom Partition Replacement
Results
Florence, Killen, Waterloo, AL 35645

Hartford High School Restrooms
New Construction - 1,230 SF
Post-Bid
Geneva, AL 36340

Bathhouse/Pavilion for Minooka RV Park and Campground
Results
Clanton, AL 35045

Samson High School Restrooms
New Construction - 1,230 SF
Post-Bid
Samson, AL 36477

New Track and Tennis Courts for Jasper High School Package C - Toilet Facility
Results
Jasper, AL 35501

Beulah Park - Concession and Restroom Building
Post-Bid
Valley, AL 36854

Jordan-Hare Stadium - Restroom Renovations (Phase III)
Renovation
Results
Less than $1,429,034 est. value
Auburn, AL 36849

Last Updated 07/29/2020 11:19 AM
Project Title

Toilet Renovations to Robert C. Hatch High School for the Perry County Board of Education

Physical Address View project details and contacts
City, State (County) Uniontown, AL 36786   (Perry County)
Category(s) Entertainment/Recreation
Sub-Category(s) Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $156,260
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

1) Remove existing ceramic wall tile and base install new porcelain tile and base 2) Remove existing doors, install new entry doors 3) Install new tile floor over existing terrazzo floor, prep existing surface as required 4) Remove existing water closets, urinals, and lavatories. Patch walls and install new water closets, urinals, and lavatories. If not replacing fixtures, cap piping behind wall or floor and patch walls and floor for a smooth surface. 5) Remove existing toilet/urinal partitions and doors. Patch walls and floor for a smooth surface, install new toilet/urinal partitions (with top brackets) and doors. 6) remove existing wall mounted electric heater, cover opening with studs and gypsum board. 7) Remove and install new toilet accessories, patch walls as required, see specs. 8) Install new lay-in celing tiles, grid, and recessed lights (see reflective ceiling plan and effect). 9) Paint all previously painted surfaces.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents