Similar Projects
Roughly 40,000 Square Yard Asphalt Paving Project
Bidding
$900,000 est. value
Pittsfield, MA

Annual Streetscape Maintenance
Post-Bid
Less than $25,000 est. value
Pittsfield, MA

Streetscape Maintenance for Three Years
Post-Bid
Less than $90,000 est. value
Pittsfield, MA

Full Depth Reclamation - Frd Crooked Hill Road
Results
Alford, MA 01230

HMA Paving
Results
Less than $175,000 est. value
Alford, MA 012308

SAMI (Asphalt-Rubber Surface Treatment)
Post-Bid
Mill River, MA 01244

Resurfacing and Related Work on the Ashuwillticook Rail Trail
Results
Less than $4,367,000 est. value
Adams, Cheshire, Lanesborough, MA 01220

Statewide Airport Pavement Maintenance Project
Post-Bid
Less than $1,500,000 est. value

Resurfacing and Related Work along a Section of Route 7 (New Ashford Road)
Results
Less than $3,007,000 est. value
New Ashford, MA 01237

Statewide Pavement Maintenance and Pavement Markings at Various Public-Use Airports
Post-Bid
Less than $1,500,000 est. value
Wakefield, MA

Maple Street Paving
Results
$340,000 est. value
Lee, MA 01238

Yokum Pond FDR and HMA
Post-Bid
Less than $365,000 est. value
Becket, MA 01223

Resurfacing and Related Work along a Section of Interstate 90 Westbound
Results
Less than $8,466,187 est. value

2020 West Center Road Paving
Post-Bid
Less than $560,000 est. value
West Stockbridge, MA

East and West Street Paving FY 2020 Mount Washington Road Improvements
Results
Less than $389,012 est. value
Mount Washington, MA 01258

Last Updated 09/02/2020 10:41 AM
Project Title

Resurfacing and Related Work on Route 43 (Green River Road)

Physical Address View project details and contacts
City, State (County) Williamstown, MA 01267   (Berkshire County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,766,281
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"1.000","Ls","Schedule Of Operations - Fixed Price $14,000","100." "3400.000","Ft","Tree Trimming","102.1" "30.000","Ea","Tree Protection - Armoring & Pruning","102.511" "1380.000","Cy","Earth Excavation","120." "575.000","Cy","Class a Trench Excavation","141." "30.000","Cy","Test Pit For Exploration","141.1" "60.000","Cy","Class b Rock Excavation","144." "540.000","Cy","Gravel Borrow","151." "190.000","Ton","Crushed Stone","156." "2380.000","Sy","Fine Grading And Compacting - Subgrade Area","170." "20.000","Ton","Disposal Of Treated Wood Products","184.1" "3.000","Ea","Drainage Structure Adjusted","220." "25.000","Cy","Removal Of Drainage Structure Sediment","227.3" "880.000","Ft","Removal Of Drainage Pipe Sediment","227.31" "450.000","Ft","6 Inch Slot-Perforated Corrugated Plastic Pipe (Subdrain)","269.06" "35.000","Sy","Hot Mix Asphalt Waterway","280." "1.000","Ea","Gate Box Adjusted","358." "80.000","Cy","Dense Graded Crushed Stone For Sub-Base","402." "15170.000","Ft","Pavement Milling Mulch For Shoulders","402.13" "31690.000","Sy","Pavement Standard Milling","415.1" "7140.000","Lb","Calcium Chloride For Roadway Dust Control","440." "5.000","Mgl","Water For Roadway Dust Control","443." "2800.000","Ton","Superpave Surface Course – 9.5 (Ssc – 9.5)","450.22" "4670.000","Ton","Superpave Intermediate Course - 19.0 (Sic - 19.0)","450.32" "370.000","Ton","Superpave Base Course - 37.5 (Sbc - 37.5)","450.42" "1000.000","Ton","Hma For Patching","451." "5740.000","Gal","Asphalt Emulsion For Tack Coat","452." "11680.000","Ft","Hma Joint Sealant","453." "40.000","Ton","Temporary Asphalt Patching","472." "2930.000","Ft","Guardrail, Tl-3 (Single Faced)","620.13" "9.000","Ea","Trailing Anchorage","627.1" "12.000","Ea","Guardrail Tangent End Treatment, Tl-3","627.83" "13.000","Ea","Transition To Nchrp 350 Guardrail","628.21" "275.000","Ft","Highway Guard Removed And Reset","630." "2630.000","Ft","Highway Guard Removed And Discarded","630.2" "25.000","Ea","Guardrail Offset Block - w Beam","633." "15.000","Ea","w Beam Guard Panel","634." "18.000","Ea","Silt Sack","697.1" "375.000","Sy","Geotextile Fabric For Permanent Erosion Control","698.4" "95.000","Ton","Hot Mix Asphalt Sidewalk Or Driveway","702." "12.000","Ea","Rural Mail Box Removed And Reset","715." "12.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "120.000","Cy","Loam Borrow","751." "1385.000","Sy","Seeding","765." "375.000","Sy","Wetland/Basin Mix - Riparian (e253)","765.553" "6950.000","Ft","Sediment Control Barrier","767.121" "375.000","Sy","Composted Mulch Over Modified Rock","767.78" "7920.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "7.000","Ea","Maple - Red - 'October Glory' 2-2.5 Inch Caliper","776.543" "13.000","Ea","Maple - Sugar - 'Legacy' 2-2.5 Inch Caliper","776.851" "5.000","Ea","Winter King Hawthorn - Crataegus 'Winter King' 2-2.5 Inch Caliper","781.256" "15.000","Ea","Serviceberry - Amelanchier Canadensis ‘Autumn Brilliance’ 2-2.5 Inch Caliper (Multitrunk)","783.51" "325.000","Ea","Delineation For Guard Rail Termini","833.7" "1280.000","Hr","Roadway Flagger","850.41" "80.000","Day","Traffic Cones For Traffic Management","851.1" "270.000","Sf","Safety Signing For Traffic Management","852." "3080.000","Ft","Temporary Barrier Removed And Reset","853.21" "400.000","Ft","Temporary Barrier (Tl-3)","853.23" "80.000","Day","Truck Mounted Attenuator","853.403" "20.000","Ea","Temporary Impact Attenuator Removed And Reset","853.501" "2.000","Ea","Temporary Impact Attenuator Unidirectional, Non-Redirective (Tl-3)","853.53" "1400.000","Ft","Temporary Paving Markings - 6 Inch (Painted)","854.016" "1400.000","Ft","Temporary Paving Markings - 6 Inch (Tape)","854.036" "80.000","Day","Temporary Portable Rumble Strip","854.6" "80.000","Day","Portable Changeable Message Sign","856.12" "1500.000","Day","Reflectorized Drum","859." "500.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "200.000","Ea","Slotted Pavement Marker One-Way Yellow","864.32" "800.000","Ea","Slotted Pavement Marker Two-Way Yellow/Yellow","864.35" "24095.000","Ft","6 Inch Wet Reflectorized Recessed White Line (Polyurea)","868.206" "22770.000","Ft","6 Inch Wet Reflectorized Recessed Yellow Line (Polyurea)","869.206" "3.000","Ea","Traffic Sign Removed And Reset","874.2" "4.000","Ea","Traffic Sign Removed And Stacked","874.4" "30.000","Sf","Temporary Masking Of Signs","874.6" "190.000","Ton","Modified Rockfill","986."

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents