Similar Projects
Trinity Storm Water Park Phase II
Bidding
$8,221,000 to $11,714,000 est. value
Evansville, IN

2021 Street and Sewer Materials
Bidding
South Bend, IN

Collection System Improvements
Post-Bid
New Palestine, IN 46163

Jeffersonville CSO Storage Interceptor Phase 3
Post-Bid
Jeffersonville, IN

Madison Street and 65th Lane Sanitary Sewer Improvement
Results
Merrillville, IN 46410

LTCP Phase 5 - South Region CSO Abatement
Results
Noblesville, IN 46060

Marion Sewer CIPP- City Wide Sewer Lining
Bidding
Marion, IN

Hessen Cassel Storm and Sidewalk Improvements
Post-Bid
Fort Wayne, IN 46800

Montgomery Avenue and Storm Line
Results
$1,000,000 est. value
Clarksville, IN 47129

Sewer Construction Material
Term Contract
Post-Bid
Fort Wayne, IN

Sanitary Sewer Extension at the Shelbyville AASF/Readiness Center
Results
Shelbyville, IN 46176

Cass Street Bottleneck Removal
Post-Bid
Peru, IN

I-69 / SR 64 South East Quadrant Sanitary Sewer - Phase 1
Results
$470,000 to $530,000 est. value
Princeton, IN 47670

Underground Facility Locating Services
Term Contract
Post-Bid
Anderson, IN 46011

2020 Sanitary Sewer Extensions-Contract B
Results
Decatur, IN 46733

Reported 03/10/2021 12:00 AM
Project Title

West Side Interceptor Improvements, Division A

Physical Address View project details and contacts
City, State (County) Richmond, IN   (Wayne County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes but is not limited to: The construction of approximately 4,624 linear feet of sanitary sewer ranging from twelve (12) to fifty-four (54) inches in diameter installed using a combination of open-cut and trenchless methods. An earth retention system comprised of sheet piling and soil nails will be required for the open cut construction under the Richmond Avenue Bridge. The project also includes the construction of approximately 390 linear feet of dual-barrel sanitary siphon piping, ten (10) and twenty-four (24) inches in diameter, to be installed using open cut methods, which includes temporary cofferdams across the Whitewater River. Improvements also include the construction of new manhole structures as required for a complete and functioning wastewater collection system. All ancillary work such as pipe rehabilitation using cured-in-place pipe (CIPP), pipe abandonment, site demolition, and site restoration shall be provided as required by the Contract Documents.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents