Similar Projects
El Cajon Branch Library
New Construction, Infrastructure
Conception
$30,300,000 est. value
El Cajon, CA 92020

Carmel Mountain Road Fire Station - San Diego Fire-Rescue Department
New Construction, Infrastructure
Conception
$12,000,000 CJ est. value
San Diego, CA 92129

Costa Verde Commercial Shopping Center Revitalization
Addition, Demolition, New Construction, Renovation, Infrastructure - 360,000 SF
Design
$170,000,000 CJ est. value
San Diego, CA 92122

Albertsons #0071 / Valley Center
New Construction, Infrastructure - 50,907 SF
Design
$8,000,000 CJ est. value
Valley Center, CA 92082

Marine Corps Recruit Depot Female Heads (Restrooms) - Rebid
New Construction, Infrastructure - 500 SF
Bidding
$1,000,000 CJ est. value
San Diego, CA 92140

RFP Construction Manager - Construction Management for Alvarado 2nd Pipeline
Infrastructure
Post-Bid
$350,000 CJ est. value
San Diego, CA 92101

San Diego County Office of Education Campus Security Project
Renovation
Post-Bid
$1,000,000 CJ est. value
San Diego, CA 92111

SDIA - Airport Administration Building - Site Demolition and Earthwork
Infrastructure
Results
San Diego, CA 92108

Bermuda Avenue Coastal Access Replacement
Infrastructure
Results
$2,132,000 CJ est. value
San Diego, CA 92107

Oceanside Fire Station #1
Demolition, New Construction, Infrastructure
Construction
$13,579,000 CJ est. value
Oceanside, CA 92054

Nestor Field
Infrastructure
Construction
$122,124 CJ est. value
San Diego, CA 92154

The Trails At Carmel Mountain Ranch
New Construction, Infrastructure
Pending Verification
$450,000,000 CJ est. value
San Diego, CA 92101

Ocean Kamp
New Construction, Infrastructure - 126,400 SF
Pending Verification
$390,000,000 CJ est. value
Oceanside, CA 92054

Bonita Road at Acacia Avenue Drainage - San Diego County
Infrastructure
Conception
$5,925,000 CJ est. value
Bonita, CA 91902

Airport Road Hotel
New Construction, Infrastructure - 57,500 SF
Design
$21,500,000 CJ est. value
Oceanside, CA 92058

Last Updated 03/13/2023 12:04 AM
Project Title

Albert Einstein Academies Charter Elementary School Phase 1 Whole Site Modernization (Lease-Leaseback)

Physical Address View project details and contacts
City, State (County) San Diego, CA 92101   (San Diego County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $18,250,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Erickson Hall Construction is requesting bids from qualified subcontractors (licensed contractor with A, B Classification, or C Specialty license for scope noted within the Bid Packages) for: Albert Einstein Academies Charter Elementary School Phase 1 Whole Site Modernization (Lease-Leaseback) On behalf of the San Diego Unified School District Submit RFI's via email to Jim Thiss, Estimator - (760) 796-7700 or jthiss@ericksonhall.com, no later than May 11, 2022. Final addendum including RFI responses will be issued on or before May 18, 2022. Successful bidders will be required to enter into a PSA agreement and execute a PSA Letter of Assent (LOA), whereby subcontractors agree to conform to all terms and conditions set forth in the PSA. Prevailing wage requirements apply to all public works projects and must be followed per Article 17 of the General Conditions of the Request for Proposals. The applicable prevailing wage determination during construction is the one in effect on the date the GMP is first published in a newspaper of general circulation. Here, the applicable prevailing wage determination for construction services referenced in the published GMP advertisement is 2022-1. The applicable prevailing wage determination for a contract amendment that adds a Guaranteed Maximum Price (GMP) for construction services is based on the date the Prime Contractor first published an advertisement for that District defined GMP phase to subcontractors. The first bid advertisement date for each District defined GMP phase shall establish the applicable prevailing wage determination, regardless of how many times the Prime Contractor published an advertisement. That first bid advertisement to subcontractors shall state the applicable prevailing wage determination for construction services for the duration of that District defined GMP phase. Each District defined GMP phase for construction services may have a different prevailing wage determination based on its separate publication of the first bid advertisement date. Upon award bidder shall provide the required Performance and Payment Bonds be in an amount not less than ten percent (10%) of the maximum amount of bid, insurance certificates and any other required documents. In the event of failure to enter into said Contract or provide the necessary documents, said security will be forfeited. The DISTRICT reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding. No bidder may withdraw any bid for a period of one hundred twenty (120) calendar days after the date set for the opening of bids. Separate payment and performance bonds, each in an amount equal to 100% of the total Contract amount, are required, and shall be provided to the District prior to execution of the Contract and shall be in the form set forth in the Contract Documents. All bonds (Bid, Performance, and Payment) must be issued by a California admitted surety as defined in California Code of Civil Procedure Section 995.120. Project estimate is $18,000,000 to $18,250,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

1 Story Above Grade, Renovation, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents