Similar Projects
New School Facility
New Construction
Conception
$20,730,236 est. value
Ten Sleep, WY

RFQ - Construction Materials Testing and Inspection Services for the Casper State Office Building
Term Contract
Conception
Casper, WY 82601

FY23 Public Works Facility Garage Addition
Addition, Demolition, Infrastructure
Design
$420,000 CJ est. value
Torrington, WY 82240

SCSD 2 Maintenance Facility Safety Upgrades and Repairs
Renovation, Infrastructure - 9,360 SF
Design
$450,000 CJ est. value
Sheridan, WY 82801

New Ten Sleep K-12 School
New Construction
Bidding
$8,800,000 est. value
Ten Sleep, WY 82442

EMA/CLCPH Archer Storage Facility
New Construction, Infrastructure - 19,507 SF
Bidding
$3,000,000 CJ est. value
Cheyenne, WY 82007

2022 Major Maintenance Bus Hub Secure Entry
Renovation
Sub-Bidding
$650,000 CJ est. value
Casper, WY 82601

2022 Major Maintenance Bus Hub Secure Entry
Renovation
Sub-Bidding
$650,000 CJ est. value
Casper, WY 82601

Teton County Recycling Center Electrical Service Upgrade
Renovation, Alteration
Post-Bid
Jackson, WY 83001

Sweetwater County School District #1 Desert School Reroof
Renovation, Alteration
Post-Bid
WY

Design Services for New School Facility
New Construction
Results
$20,730,236 est. value
Ten Sleep, WY 82442

Thyra Thomson State Office Building Cubicles
Renovation
Results
Casper, WY 82601

Wyoming State Fair Master Plan
Term Contract
Pending Verification
Cheyenne, WY 82001

Rocky Mountain Granite
New Construction, Infrastructure - 5,000 SF
Pending Verification
$600,000 CJ est. value
Cody, WY 82414

RFQ Engineering - Professional Engineer Services for Phase 1 Environmental Site Assessments
Infrastructure
Conception
$300,000 CJ est. value
Cheyenne, WY 82001

Last Updated 11/16/2022 04:09 PM
Project Title

2022 Major Maintenance Central Services Secure Entry

Physical Address View project details and contacts
City, State (County) Casper, WY 82601   (Natrona County)
Category(s) Commercial, Education, Government/Public
Sub-Category(s) Elementary School, Middle/Senior High School, Misc. Buildings, Office
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $650,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Secure Entry Central Services The Owner reserves the right to reject all bids or any bid or to waive any irregularities in any bid, or to accept any bid which will best serve the interests of the Owner. Bid Bond in the amount of 5% of the bid total shall be submitted with proposals at time of bid. Performance and Payment Bonds will be required from the successful bidders. All current Wyoming Preference Acts, Statutes and Laws shall be in effect.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Entrances, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents