Last Updated 02/12/2020 04:42 AM
Project Title

Preservation - District 4

Physical Address View project details and contacts
City, State (County) (Cherokee, Union Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Removal & Disposal Of Existing Pavement 150.000 Sy Removal & Disposal Of Existing Concrete 3.000 Cy Borrow Excavation 15.000 Cy Excavation For Shoulder Paving 14.000 Sta Hauling Of Excavated Shoulder Material 14.000 Sta Hma Shoulder Widening Course 137.280 Ton Liquid Asphalt Binder Pg64-22 8.489 Ton Full Depth Asph. Pav. Patching 6" Unif. 500.000 Sy Full Depth Asph. Pav. Patching 8" Unif 900.000 Sy Full Depth Asph. Pav. Patching 10"Unif 2,300.000 Sy Milled-In Rumble Strip 3.180 Mi Hot Mix Asphalt Surface Course Type e 25.000 Ton Preventative Maintenance Surface Treatment 72,428.597 Sy Permanent Construction Signs (Ground Mounted) 1,346.000 Sf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 24,432.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 57,065.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 549.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 26.000 Ea White Word Message "Only"-Fast Dry Paint 20.000 Ea White Combination Arrow(Str.& Rt.Or Str.& Lt.)Fast Dry Paint 12.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 1,800.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 82,039.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 120.000 Lf 4" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 11,315.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 7,200.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 185.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 9.000 Ea White Word Message "Only" -Thermoplastic - 125 Mil. 6.000 Ea White Combination Arrows(Str&Rt.Or Str&Lt)Thermo-125mil 6.000 Ea 4" Yellow Broken Lines(Gaps Exc)Thermoplastic - 90 Mil. 500.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 20,652.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 171.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 617.000 Ea Removal Of All Pavement Markings 7.180 Lm 4" White Broken Lines- (Gaps Excld) - Single Component Hybridized Polymer– 20 Mils 901.000 Lf 4" White Solid Lines-(Pavement Edge Lines)-Single Component Hybridized Polymer–20 Mils 21,333.000 Lf 24" White Solid Lines-(Stop/Diagonal Lines)-Single Component Hybridized Polymer–20 Mils 88.000 Lf White Single Arrows (Left, Striaght, Right) Single Component Hybridized Polymer–20 Mils 4.000 Ea White Word Message "Only" - Single Component Hybridized Polymer– 20 Mils 4.000 Ea 4" Yellow Broken Lines (Gaps Excluded) - Single Component Hybridized Polymer - 20 Mils 400.000 Lf 4" Yellow Solid Lines (Pavement Edge & No Passing Zone) - Single Component Hybridized Polymer - 20 Mils 20,368.000 Lf Detectable Warning Material 75.000 Sf Pedestrian Ramp Construction 150.000 Sy Permanent Grassing For Non-Permitted Resurfacing Projects 0.100 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents