Similar Projects
Last Updated | 04/13/2023 10:14 AM |
Project Title | Taxiway M/B Reconstruction and GA RunUp Area Project |
Physical Address | View project details and contacts |
City, State (County) | Reno, NV 89502 (Washoe County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Runways/Taxiways, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $5,600,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | DESIGN AIP#: 3-32-0017-109-2021 The Reno-Tahoe Airport Authority (RTAA) has issued this Invitation to Bid (ITB) with the sole purpose and intent of obtaining sealed bids (Bid) from qualified contractors (Contractor) to reconstruct Taxiway M and B and install a new general aviation (GA) runup area (Project). If awarded, a contract (Contract) will be effective on the date the Contract is approved by the RTAA Board of Trustees, signed by all required parties, and filed with the Manager of Purchasing and Materials Management. However, the RTAA reserves the right to not award a contract for any work herein; issuance of this ITB does not guarantee any subsequent award. Furthermore, the RTAA reserves the right to hire any additional contractors or consultants as needed at its discretion. It is the intent of the RTAA to select a qualified Contractor licensed to work in the State of Nevada to preform work on Taxiway M and B and install GA run-up off taxiway C. The existing Taxiway B & M pavement surfaces are showing signs of deterioration due to extended use and service life constraints. Reconstruction of the pavement along with an update of the taxiway geometry, as applicable, and associated airfield electrical improvements are required at this time. In addition, current airport operations require the addition of one (GA) run-up area along Taxiway C (north). The contractor shall provide all material, labor, tools, expendable equipment, transportation services, permits and fees, utilities required, and all incidental items necessary to provide the scope of work entitled "Taxiway M/B Reconstruction and GA Run-Up Area Project" per the drawings, plans, and specifications provided herein as Volume II - Technical Specifications and Geotechnical Report, subject to all terms and conditions contained in this ITB. Funding for this Project has not yet been approved. The funding source, 93.75%, is a federal grant with the remainder (6.25%) to be funded by the RTAA. The Engineer's Estimate for the project including the Base Bid and all Alternates is $10,100,000. Question Cuttoff Date & Time 3/13/2023 08:00:00 PM (ET) AIP DESIGN GRANT 3-32-0017-109-2021 |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |