Similar Projects
Last Updated | 08/01/2022 03:04 PM |
Project Title | Track Improvements |
Physical Address | View project details and contacts |
City, State (County) | Carsonville, MI 48419 (Sanilac County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Construction Manager |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Complete proposals will be received for the following work categories in accordance with drawings and specifications as prepared by the Architect, Engineers and/or Construction Manager. BID CATEGORY 1: ASPHALT PAVING BID CATEGORY 2: TRACK SURFACE School will be utilizing track until June 6th , 2022. All questions regarding the plans and specifications are to be emailed to R.C. Hendrick & Son, Inc. at chip@rchendrick.com. Each bid that exceeds Fifty Thousand Dollars ($50,000) must be submitted with an attached certified check or bid bond from a surety company approved to do business in the State of Michigan, payable to the Owner in an amount not less than five percent (5%) of the base bid. The Owner reserves the right to reject any, part of any or all bids and to waive all informalities in the bidding procedures. The Owner reserves the right to reject any bid when Bidder fails to submit data required by the Bidding Documents, or if the bid is submitted incomplete or irregular. No telephonic, email, fax bids or modification to a submitted bid will be received or considered by the Owner. Designation of the Work to be performed by the Bidder with his own forces. B. Proprietary names and the suppliers of principal items or systems of materials and equipment proposed for the Work. C. List of names of the subcontractors or other persons or entities (including those who are to furnish materials or equipment fabricated to the special design) proposed for the principal portions of the Work. D. A list of proposed job site staff and home office staff directly involved with this Project. Indicate the qualifications, pay rates, titles, responsibilities, and duties of each person. E. Certificates evidencing insurance coverage in the amounts and types specified. F. An interim construction schedule in a bar graph format. G. A completed Schedule of Values in the format provided by the Owner. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |