Similar Projects
18TH Avenue North Ocean Outfall
Infrastructure
Bidding
North Myrtle Beach, SC

Cherry Gove Barge Landing, Bulkhead and Excavation 2022
Infrastructure
Bidding
North Myrtle Beach, SC

State Park Piers Repair - Hunting Island
Post-Bid
$750,000 to $1,000,000 est. value
Saint Helena Island, SC 29920

Furnish and Install A Dock at Pack's Landing
Post-Bid
Rimini, SC

Surfside Beach Fishing Pier Restoration Project
Results
Surfside Beach, SC 29575

Marine Contractors for the Construction of the Battery Park Pedestrian Bridge
Results
North Charleston, SC 29406

Beach Walkover Improvements
Infrastructure
Bidding
North Myrtle Beach, SC

Underwater Piling Installation
Post-Bid
$25,000 to $100,000 est. value
Eastover, SC

TC Dock Repair
Results
Charleston, SC 29404

Saluda Shoals Front Bridge and Over Look Repair
Post-Bid
$22,000 est. value
Columbia, SC 29212

Green Pond Landing Weigh-in-Dock Project
Results
Less than $500,000 est. value
Anderson, SC

Train Depot Deck Repair
Post-Bid
York, SC 29745

Chehaw Pier Replacement
Results
Walterboro, SC

Herbert H. Jessen Boat Landing Improvements
Renovation
Post-Bid
Summerville, SC 29485

Loading Dock Levelers Final 1
Results
Rock Hill, SC 29732

Reported 04/06/2022 12:00 AM
Project Title

Cooper River Marina Transient Dock Repairs

Physical Address View project details and contacts
City, State (County) North Charleston, SC 29405   (Charleston County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency - 03/01/22
Owner View project details and contacts
Architect View project details and contacts
Description

Conduct repairs to the transient floating dock system at the Cooper River Marina located at the confluence of the cooper river and shipyard creek at 1010 Juneau Avenue, in North Charleston, SC. The Cooper River Marina is a public marina owned and operated by the CCPRC. The marina was established in or around 1992 and currently provides 152 dedicated slips and 650 linear feet of side-tie dockage for local, regional, and transient vessels.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents