Similar Projects
Last Updated | 02/23/2022 12:57 PM |
Project Title | 2022 West Third Street Reconstruction |
Physical Address | View project details and contacts |
City, State (County) | Beaver Dam, WI (Dodge County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work for which bids are asked includes the following: 1,875 LF of sanitary sewer and laterals (6” thru 8” PVC) along with associated sanitary sewer work; 1,175 L.F. of water main (6” thru 8” PVC) and services; 150 LF of storm sewer (12” thru 18” RCP) and associated storm structure work; 4,125 S.Y. aggregate base and geogrid installation; 1,000 S.Y. topsoil and sodding; 55 TON of asphalt pavement; 3,125 S.Y. of concrete pavement; 10,550 S.F. of concrete sidewalk; 2,125 L.F. concrete curb and gutter; 2,950 S.F. concrete driveway approach; as well as all related work including unclassified excavation, erosion control, and traffic control. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |