Similar Projects
New Terminal at Weatherford OJA Airport
New Construction
Post-Bid
$1,000,000 to $1,500,000 est. value
Weatherford, OK 73096

Jones Memorial Airport Terminal Building
New Construction
Post-Bid
Bristow, OK 74010

Last Updated 07/28/2021 01:04 PM
Project Title

Delta Air Lines Operations Build Out

Physical Address View project details and contacts
City, State (County) OK 73159   (Oklahoma County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $440,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Delta Air Lines Operations Build Out Will Rogers World Airport For Oklahoma City Airport Trust Oklahoma City, Oklahoma.

Details

Airline/Passenger Terminal, Build-Out.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents