Similar Projects
Kitchen Equipment Replacement Installation
Post-Bid
Shiprock, NM

Mora County Senior Center Kitchen Equipment and Installation
Post-Bid
Mora, NM 87732

Interior Fire Training Prop
Results
$100,001 to $1,000,000 est. value
Farmington, NM 87402

Fabric Structures with Related Materials and Services
Results

Smith's Grocery Store #467
Construction
$200,000 est. value
Los Alamos, NM 87544

Playground Equipment
Post-Bid
Tuba City, AZ - Shiprock, NM

Hoist and Crane Maintenance Services
Results
NM 88103

Hoist and Crane Services
Post-Bid
Clovis, NM 88103

Vehicle Lifts, with Garage and Fleet Maintenance Equipment
Results

Warehouse Racking Hardware, Installation And Remedial Services
Post-Bid
$100,000 est. value

Welding Program Air Compressors and Receiver Tank
Results
Farmington, NM

Forklift
Post-Bid
Albuquerque, NM 87106

DMOC Fitness Locker
Results
NM

Hydraulic Variable Rake Shear
Post-Bid
Albuquerque, NM

JCPenney #2434 - Vertical Transportation
Renovation
Post-Bid
Albuquerque, NM 87110

Last Updated 04/15/2021 01:34 PM
Project Title

UNM Cancer Center Scaffolding

Physical Address View project details and contacts
City, State (County) Albuquerque, NM   (Bernalillo County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Ring lock scaffolding to assist in an ongoing construction project and ensure the safety of our team. Scaffolding will be located on the rooftop of the Cancer Center and will have six levels. The scaffold requires aluminum planks to reduce loads on the rooftop and planks must have a variety of widths and lengths, also compatible to a steel structure. The ring lock scaffold will be compromised of steel (the aluminum and steel material quantities are located in the bill of materials). The scaffold structure must equal to the estimated weight listed in the bill of materials. The stairs will connect to the ground floor and will allow access to the scaffolding located on the roof. The scaffolding requires security options to the entry way –please provide recommendations.

Details

Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents