Similar Projects
Construction of Century High School 2022 West Parking Lot Improvements
Infrastructure
Bidding
$275,000 est. value
Bismarck, ND 58503

Bismarck Parkade Ramp Limited Green Level Repairs
Infrastructure
Post-Bid
Bismarck, ND 58501

Military Parking Lot Surfacing - Aviation Readiness Center Complex
Infrastructure
Post-Bid
Bismarck, ND

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Parking Lot Expansion
Results
Bismarck, ND

Hay Creek Trail Rehabilitation
Infrastructure
Post-Bid
$198,000 est. value
Bismarck, ND 58501

Bus Lane and Parking
Results
Bismarck, ND 58501

Crack Sealing
Infrastructure
Post-Bid
$500,000 est. value
Bismarck, ND

PCC Pavment, Curb Gutter, Traffic Signals, Lighting, Signing and Pavement Marking
Results
$600,001 to $800,000 est. value
ND

Sewer Utility Project No. 78
Results
$116,500 to $136,100 est. value
Bismarck, ND

Unit 5 - Igoe Park Parking Lot Replacement Improvement
Results
$138,000 to $184,000 est. value
Bismarck, ND 58503

Grading, Aggregate Base Course
Results
ND

PCC Pavement and Concrete Median Barrier
Results

Random Crack Sealing
Results
$71,800 to $83,700 est. value
Bismarck, ND

Highway Concrete Pavement Repair
Results
$229,000 to $267,000 est. value
Bismarck, ND

Last Updated 06/16/2022 05:59 AM
Project Title

Street Improvement District No. 565 and Sewer Improvement District No. 581

Physical Address View project details and contacts
City, State (County) Bismarck, ND   (Burleigh County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of Storm Sewer, Asphaltic Concrete and Related Items. Work shall consist of approximately 8 inlets, 1,400 LF of storm sewer, 5 manholes, 2,000 CY of blended base, 5,300 LF of curb and gutter, 2,200 Tons of AC superpave, 10,000 SY of seal coat, and related items.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents