Similar Projects
Mississinewa Retreat Channel Repair
Post-Bid
$1,000,000 to $5,000,000 est. value
Peru, IN 46970

Hidden Lake Park Paving
Post-Bid
Merrillville, IN 46410

Downtown Parking Lot Renovation
Renovation
Results
Highland, IN 46322

2020 CCMG Street Improvement
Renovation
Results
Highland, IN 46322

Trench Box Rental
Post-Bid
Indianapolis, IN 46077

Community Crossing Street Resurface Program
Results
Lake Station, IN 46405

48" Precast Reinforced Concrete Pipe
Post-Bid
Indianapolis, IN 46077

Community Crossings 2020 Street Repair and Resurfacing
Results
Kouts, IN 46347

Engineering Services for 2021 Site Improvements @ Haley Elementary School
Post-Bid
Fort Wayne, IN 46802

Median Construction
Results
Hammond, IN 46320

Apple Road Resurfacing
Post-Bid
Osceola, IN 46561

Box Culvert Replacement and Debris Removal from Channel
Results
IN

Marengo Industrial Park Roadway Engineering Services
Post-Bid
Marengo, IN 47140

Concrete Pavement Restoration and Bridge Deck Overlay
Results
IN

Street Resurface & Repair
Post-Bid
Winona Lake, IN 46590

Reported 04/02/2021 12:00 AM
Project Title

2020 CCMG Resurfacing and Drainage

Physical Address View project details and contacts
City, State (County) Gaston, IN   (Delaware County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Mill Street: From Broad St to West St, mill entire roadway section, sweep clean, 3.5 inches of HMA patching where needed, tack coat,and pave with 1.5 inches of Hot Mix Asphalt surface. Replace catchbasin, inlets, and adjust manholes, inlets, and water valves if needed. Washington Street: From Vine St to Elm Street, mill entire roadway section, sweep clean, 3.5” of HMA patching where needed, tackcoat, and pave with 1.5 inches of Hot Mix Asphalt surface. Install inlets, storm manholes and storm sewer pipe. Adjust manholes, inlets,and water valves if needed. High Street: From Washington St to Monroe St, mill entire roadway section, sweep clean, 3.5” of HMA patching where needed, tackcoat, and pave with 1.5 inches of Hot Mix Asphalt surface. Install inlets, catch basins, and storm sewer pipe. Adjust manholes, inlets,and water valves if needed. Maple Street: From Sycamore St to Madison St, mill entire roadway section, sweep clean, 3.5” of HMA patching where needed, tackcoat, and pave with 1.5 inches of Hot Mix Asphalt surface. Install inlets. Manholes, and storm sewer pipe. Adjust manholes, inlets, and water valves if needed. Jackson Street: From Elm St to Town Limits, mill entire roadway section, sweep clean, 3.5” of HMA patching where needed, tack coat, and pave with 1.5 inches of Hot Mix Asphalt surface. Install inlets, pipe catch basins, and storm sewer pipe. Adjust manholes, inlets,and water valves if needed and all related work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents