Similar Projects
Millwork, Framing and Drywall On-Call Single Trade Services
Post-Bid
Denver, CO 80202

ACC DQ 20-3-920 Feature Wall
Post-Bid
Denver, CO

Door Replacements - Dunn Elementary School
Results
Fort Collins, CO

Interior Finish Work at FAA's Denver ARTCC's Childcare Facility Located in Longmont, CO
Results
$250,000 to $500,000 est. value
Longmont, CO

Protective Coatings
Post-Bid
CO

Soundproofing of 2nd Floor
Results
Grand Junction, CO 81501

Bvcc Twc Partition Cubicles
Post-Bid
Buena Vista, CO

Waterproofing of Windows and Building Perimeter
Results
Littleton, CO 80120

Berthoud Headquarters Wall Covering Project
Post-Bid
Berthoud, CO 80513

Broomfield Flooring and Drywall Replacement Project
Results
Broomfield, CO 80020

Julesburg Rest Area EIFS Repair and Window Replacement
Post-Bid
Less than $160,000 est. value
Julesburg, CO 80737

As-Needed Painting and Drywall Services
Term Contract
Results
Aspen, Carbondale, Glenwood Springs, Parachute, Snowmass, CO

Challenge School Gym Wall Padding
Term Contract
Post-Bid
CO

Annual Maintenance - Resurface/ Refinishing Repairs
Term Contract
Results
Loveland, Milliken, Windsor, CO 80538

Municipal Justice Center - 911 Center Ceiling Mounted Cooling System
Post-Bid
Pueblo, CO

Reported 03/07/2020 12:00 AM
Project Title

HPER - Massari Arena Divider Curtains - Phase 1

Physical Address View project details and contacts
City, State (County) Pueblo, CO 81001   (Pueblo County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Upgrade Massari Arena by installing divider curtains between the existing three courts to provide the necessary separation of activities on each court. This will be done in phases. This first phase will entail installing the entire scope of the electrical work for two (2) curtains, but installing only one (1) curtain at this time. Contractor is responsible to provide the University with a “turnkey” project.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents