Similar Projects
Sycamore Road Self-Storage Facility
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Dekalb, IL 60115

2024 Bond - Central School District 301
New Construction, Infrastructure, Renovation
Conception
$195,000,000 CJ est. value
Sycamore, IL 60178

First United Methodist Church
New Construction, Infrastructure - 10,986 SF
Design
$600,000 CJ est. value
Dekalb, IL 60115

RFP-Engineering Services -2024 STU Project
Infrastructure
Bidding
$656,250 CJ est. value
Sycamore, IL 60178

Mill 2 Hot-Mix Asphalt, Pavement Class D Patch, Sidewalk
Infrastructure
Bidding
$2,000,000 CJ est. value
Cortland, IL 60112

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Milling and Resurfacing on IL 38. Some ADA Work and Traffic Signal Improvements Are Proposed
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Dekalb, IL 60115

2022 Streets Program Bid Package 2
Infrastructure
Results
$814,931 CJ est. value
Dekalb, IL 60115

2022 Streets Program Bid Package 4
Infrastructure
Results
$499,071 CJ est. value
Dekalb, IL 60115

Construct Northern Illinois Center for Community Sustainability - Northern Illinois University
New Construction, Infrastructure - 30,000 SF
Pending Verification
$24,000,000 CJ est. value
Dekalb, IL 60115

McDonald's Remodel / DeKalb
Infrastructure, Build-out
Pending Verification
$1,000,000 CJ est. value
Dekalb, IL 60115

Site Improvements Project at Hinckley-Big Rock High School
Infrastructure
Post-Bid
$400,000 est. value
Hinckley, IL 60520

Hot-mix Asphalt Milling
Infrastructure
Results
$67,138 CJ est. value
Shabbona, IL 60550

Lacey's Place
New Construction, Renovation, Infrastructure - 2,000 SF
Pending Verification
$300,000 CJ est. value
Dekalb, IL 60115

Excavation and Concrete 105 Dutch Street
Infrastructure
Post-Bid
$758,000 CJ est. value
Sandwich, IL 60548

Last Updated 06/16/2023 01:13 PM
Project Title

Fisk Avenue Multi-Residential Development

Physical Address View project details and contacts
City, State (County) Dekalb, IL 60115   (DeKalb County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 14 2023, This project is still in design development. Information regarding a general contractor has not been disclosed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

4 Stories Above Grade, Renovation, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents