Similar Projects
Bally's Casino / Chicago
LEED Certification, New Construction, Infrastructure
Design
$1,700,000,000 CJ est. value
Chicago, IL 60654

London Crossing
New Construction, Infrastructure - 32,600 SF
Design
$11,000,000 CJ est. value
Wheeling, IL 60090

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Burley ES - LBP Mitigation and ACM Patch & Repair in the Ventilation System
Term Contract, Infrastructure
Results
$29,725 CJ est. value
Chicago, IL 60657

2022 Sidewalk and Concrete Maintenance
Results
Palatine, IL 60067

Lincoln Yards South Package A-1 & B
Construction
Chicago, IL 60632

Auburn Park Station & Parking Facility
New Construction, Alteration - 4,678 SF
Construction
Chicago, IL 60620

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

Foundry
New Construction, Infrastructure - 13,100 SF
Design
$163,000,000 CJ est. value
Chicago, IL 60607

Roadway Pavement Rehabilitation
Infrastructure
Post-Bid
Hoffman Estates, IL

McCook and Thornton Reservoirs Rock Wall Stabilization and Geotechnical Instrumentation
Renovation
Results
$8,460,000 to $10,250,000 est. value
Bedford Park, IL 60501

Lake Street Office
New Construction, Infrastructure - 67,600 SF
Construction
$16,600,000 CJ est. value
Chicago, IL 60607

Dialysis Care Center Western
New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Chicago, IL 60620

Last Updated 01/23/2023 04:40 PM
Project Title

2023 Harvey Avenue Reconstruction

Physical Address View project details and contacts
City, State (County) Western Springs, IL 60558   (Cook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,430,449 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project was awarded to R.W. Dunteman Company, in the amount of $1,430,448.65. The Village reserves to right to change the location of the opening or host it publicly in a virtual setting. Contractors will be notified of any location change via an addendum. The project consists of but is not limited to concrete roadway reconstruction, partial storm sewer replacement, curb and gutter removal and replacement, P.C.C. sidewalk remove and reconstruction at specified locations, drainage/utility adjustments and reconstructions, PCC patching at various locations, sanitary sewer point repair, and landscape restoration along Harvey Avenue within the Village of Western Springs. Contractor(s) shall not less than the prevailing rate of wages as found by the Village or the Department of Labor, or as determined by the Court on Review, shall be paid to all laborers, workmen, and mechanics performing work as indicated in the special provisions to the specifications. If at the time the Agreement for this Project is executed, or if during the term of the Agreement, there is excessive unemployment in Illinois as defined in the Employment of Illinois Workers on Public Works Act, 30 ILCS 570/0.01 et seq., as two consecutive months of unemployment exceeding 5%, the Bidder agrees to employ Illinois laborers in accordance with the "Employment of Illinois Workers on Public Works Act". An "Illinois laborer" is defined as any person who has resided in Illinois for at least thirty (30) days and intends to become or remain an Illinois resident. The Village of Western Springs is exempt from the Illinois State, municipal or county Retailers Occupation Tax, Service Occupation Tax, Use Tax, and Service Use Tax as described in Illinois Compiled Statute Chapter 35. Bid prices shall not include the cost of such taxes. 4. All Bids must be accompanied by a Bidder's bond, certified check, bank cashier's check or bank draft payable to the Village of Western Springs for five percent (5%) of the total amount of the Bid as provided in the Bidder Instructions. 5. Rejection of Bids. The Board of Trustees reserves the right to reject any or all Bids and to waive technicalities. Unless the Bids are rejected for good cause, award of contract shall be made to the lowest responsible and responsive Bidder.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents