Similar Projects
HWR RAS Piping and MCC Replacement
Post-Bid
Hopewell, VA 23860

Well Abandonment Services
Results
Middleburg, VA

Wellhead Protection
Results
Richmond, VA 23218

Open/Clean/Inspection of Wilden Diaphragm Pumps (OEM or Aftermarket Equivalent)
Results
Portsmouth, VA

Construction of Water Wells, Pipelines, and Treatment Facilities at Shenandoah National Park
Results
$6,000,000 to $10,000,000 est. value
Shenandoah, VA

Pump Repair Services for the Public Service Authority
Term Contract
Results
VA

Metering Pumps
Results
$11,550 est. value
VA

Submersible Pump Repair Service
Term Contract
Results
Fairfax, VA

Summit Pointe Pump Station and Force Main
Results
$2,709,000 est. value
Chesapeake, VA 23328

Upgrade LS Controls and Pumps to 3 Phase Power
Results
Hanover, VA

Montpelier Recreational Park Water Supply Well
Results
$33,096 est. value
Hanover, VA 23069

Elbow Road Pressure Reducing Station (CE011821)
Results
$5,957,800 est. value
Virginia Beach, VA 23455

Mobile Dewatering Unit - NS Design and Construction
Results
West Point, VA 23181

Geothermal Piping Replacement - Mason Crest Elementary School
Results
Annandale, VA 22003

KSB Pump
Results
Woodbridge, VA 22192

Reported 04/14/2021 12:00 AM
Project Title

Water Pump Test Stand HMI Installation & Configuration

Physical Address View project details and contacts
City, State (County) Portsmouth, VA 23709   (Portsmouth City County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Water pump test stand - HMI Installation and Configuration: scope covers the requirements to review and recommend for Water Pump test stand to communicate through a Rockwell terminal for Site Edition (SE) and Machine Edition (ME) application to the PLC to allow the Water Pump test stand to operate from the Human Machine Interface (HMI) Versa View for operating the test stand. - B171, 1st. Floor, Water Test Section

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents