Similar Projects
Berkeley Dorchester Interconnect Division II
New Construction, Infrastructure
Bidding
Ridgeville, SC

Main Street Water Line Extension
Infrastructure
Bidding
Clinton, SC

Water Meter Replacement
Post-Bid
McCormick, SC

Hollywood/Ravenel Water Main Extension Phase 3
Post-Bid
Charleston, SC 29401

Beach Club Villas Water Main Replacement
Results
Isle of Palms, SC 29451

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

East Cooper Avenue to East Hudson Avenue Water Main Replacement
Infrastructure
Bidding
Folly Beach, SC 29439

Water Main Replacements
Post-Bid
Summerville, SC 29483

2020 Waterline Improvement Projects Pipe, Valves and Various Materials
Results
Less than $38,000 est. value
North Augusta, SC 29861

Asbestos Cement Waterline Replacement Project
Infrastructure
Bidding
Gaston, SC

South Fishtrap Road 24 Inch Transmission Main
Post-Bid
Easley, SC 29642

Backflow Prevention Assembly Installation, Testing And Repair
Results
Pawley's Island, SC 29585

Hall Street 6 Replacement Main
Infrastructure
Bidding
Westminster, SC

2020 Water System Improvements
Post-Bid
Less than $260,000 est. value
Lexington, SC 29835

Phase II Replacement of Approximately 2,750 Linear Feet of 24-inch Wastewater Line
Results
Less than $821,020 est. value
Bishopville, SC 29010

Last Updated 02/10/2022 09:08 AM
Project Title

FY 2022 - Fire Hydrant Replacement

Physical Address View project details and contacts
City, State (County) Georgetown, SC   (Georgetown County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $41,207
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The project includes to repair and/or replace existing fire hydrants and post hydrants throughout its coverage area of Georgetown County. The Contractor shall be responsible for all labor, materials, and equipment to make the necessary replacements. Each existing fire hydrant should be already equipped with a hydrant valve which will allow the contractor to make the replacement without an interruption of service to customers. However, it will be the responsibility of the contractor to restrain or block the hydrant valve if it is not already restrained. In the event that a hydrant does not have an existing valve, the contractor shall notify GCWSD staff to schedule a time for water interruption. The contractor shall install a hydrant valve to any location that does not already have one. Contractor shall have proper signage according to SCDOT and Georgetown County standards when working along roadways. Thrust blocks shall be used when restrained pipe is not present in the existing piping to ensure hydrant will remain intact after water is restored at the hydrant.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents