Similar Projects
Comprehensive Everglades Restoration Plan, Indian River Lagoon - South C-23/24 Stormwater Treatment Area
Bidding
$100,000,000 to $175,000,000 est. value
Port Saint Lucie, FL

FY21 SOF Combat Aircraft Parking Apron - North, Hurlburt Field, Florida
Term Contract
Bidding
$25,000,000 to $100,000,000 est. value
Eglin AFB, FL

Taxiway B Rehabilitation Winter Haven Airport
Post-Bid
$358,000 est. value
Winter Haven, FL 33881

Runway 6-24 and Taxiway B and D Lighting Rehabilitation at Apalachicola Regional Airport
Post-Bid
Apalachicola, FL 32320

F--Wetlands Restoration/Maintenance
Results
West Palm Beach, FL 33410

Rehabilitate Northeast Quadrant Taxiways A, B and C at Lakeland Linder International Airport
Results
Lakeland, FL 33801

Apron/Main Ramp Rehabilitation Construction (210221)
Infrastructure
Bidding
$2,300,000 to $2,800,000 est. value
Leesburg, FL 34788

Mitigation Implementation Project
Post-Bid
Panama City, FL 32409

Repair Cracks, Joints, Slabs, Airfield
Results
$1,000,000 to $5,000,000 est. value
Patrick AFB, FL 32925

Pavement Rehabilitation
Infrastructure
Bidding
Tampa, FL 33607

Cody Sod Wetlands Restoration
Post-Bid
Okeechobee, FL 34972

Runway 5-23 and Apron Rehabilitation George T Lewis Airport
Results
Cedar Key, FL 32625

Remove, Re-Grade, and Install New Rubberized Surface Material Under Static Aircraft Mounds.
Post-Bid
Panama City, FL 32403

Robinson Preserve Expansion Phase IIB Restoration
Results
Bradenton, FL 34205

Taxiway Delta Phase II Reconstruction
Post-Bid
Pompano Beach, FL 33060

Last Updated 08/03/2021 08:02 AM
Project Title

Runway 4-22 Rehabilitation/Reconstruction and Wetlands Mitigation Phase 2

Physical Address View project details and contacts
City, State (County) Punta Gorda, FL 33982   (Charlotte County)
Category(s) Environmental, Heavy and Highway
Sub-Category(s) Runways/Taxiways, Wetlands/Remediation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $16,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of providing all labor, materials, and equipment at the Punta Gorda Airport to rehabilitate/reconstruct Runway 4-22 and fill approximately 37 acres of wetlands.

Details

Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment, Water Remediation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Wetlands, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents