Similar Projects
Wastewater Facilities Management Plan
Term Contract
Bidding

Consulting Services for Town Wide Land Use Masterplan
Infrastructure
Bidding
$160,000 est. value
Wenham, MA

Request for Information AE Next Pool 2 Architect-Engineering Services for Design and Construction Support for the Air Force Construction Program
Post-Bid

Construction Inspection IDIQ (MATOC)
Post-Bid
Less than $100,000,000 est. value

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

Ipswich Public Safety Building
New Construction, Alteration
Bidding
Ipswich, MA

Geotechnical A-E IDIQ
Post-Bid
Less than $4,000,000 est. value

Operations and Maintenance Engineering Enhancement
Results
Less than $990,000,000 est. value

Request for Designer Services - Whittier Regional Vocational Technical High School
Renovation, Infrastructure
Bidding
$125,000,000 to $225,000,000 est. value
Haverhill, MA 01830

Study and Design for General Building Renovations, Repairs and Upgrades
Term Contract
Post-Bid
$4,500,000 est. value

Architect-Engineer Services for Multiple-Award Indefinite Delivery Indefinite Quantity Contracts
Results
$8,000,000 est. value

Consulting Services for Andover Public Schools
Post-Bid
Andover, MA 01810

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

Assessing Management Services
Term Contract
Post-Bid
Swampscott, MA

Reported 03/18/2022 12:00 AM
Project Title

Comprehensive Master Plan - Consultant Services

Physical Address View project details and contacts
City, State (County) Andover, MA   (Essex County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $90,000
Plans Available from Municipal Agency - 02/14/22
Owner View project details and contacts
Architect View project details and contacts
Description

The prospective Consultant will: Review the Town’s existing plans and documents relevant to the Master Plan, including but not limited to, the 2012 Master Plan, the 2018 Housing Production Plan, the 2018 Open Space and Recreation Plan, 2019 Residents Survey. This will assist the consultant with understanding the existing conditions and help to set a foundation for progressing forward. Note: Other documents that can be available for background information during the Master Planning process are the Sidewalk Master Plan, the DEI Strategic Plan, the Town Manager’s Strategic Plan, Andover Facilities Master Plan, GIS information, etc. Note: Overall, the Town has continuously updated and revised planning studies with current and relevant information that staff feels will be helpful to the process. ? Review the Master Plan Steering Committee’s 2021 Affinity Map and 2022 Vision Survey (i.e. data collected in Vision Survey, possibly cross-tabulating with census data from the town, creating summary report of the findings). ? Develop a project schedule that allows for regular meetings with, and status updates to the MPSC, the Planning Board, planning staff, and (as needed) Town Officials. ? Develop a strategy to engage residents, business interests, community groups, and other stakeholders to foster a sense of inclusivity to the process. The strategy should include a social media and Town website component. The Consultant may include staff and resource assistance from the Planning Division in this strategy.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents