Similar Projects
Main Street and San Juan Boulevard Intersection Upgarde - City of Farmington
Infrastructure
Conception
$250,000 CJ est. value
Farmington, NM 87401

Broadway and Butler Intersection Upgarde - City of Farmington
Infrastructure
Conception
$250,000 CJ est. value
Farmington, NM 87401

Blanco Flume Replacement
Infrastructure
Bidding
$650,000 CJ est. value
Bloomfield, NM 87413

Blanco Flume Replacement
Infrastructure
Bidding
$650,000 CJ est. value
Bloomfield, NM 87413

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ Contractor - El Vado Dam Spillways and Dam Crest Modification Project
Infrastructure
Post-Bid
$86,000,000 CJ est. value
Tierra Amarilla, NM 87575

2021 Manhole and Water Valve Adjustment
Infrastructure
Results
$291,400 est. value
Farmington, NM

Y--NM-Valle De Oro NWR-Water Control Wetland 1 & 2 On
Term Contract
Results
Albuquerque, NM 87105

Rehabilitate Taxiway A - Construction - City of Farmington
Infrastructure
Conception
$320,000 CJ est. value
Farmington, NM 87401

Adult Detention Training and Wellness Center
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Farmington, NM 87401

Aztec Airport Improvements 2022 Runway 8-26 Lighting and Visual Aids
Infrastructure
Post-Bid
$400,000 CJ est. value
Aztec, NM 87410

East Culpepper Water Connection for North Star MDWCA
Infrastructure
Results
$2,900,794 est. value
Aztec, NM

Lake Farmington - Rehabilitation Rip Rap on Dam - City of Farmington
Infrastructure
Conception
$500,000 CJ est. value
Farmington, NM 87402

Roadway Rehabilitation
Infrastructure
Bidding
$600,000 CJ est. value
Bloomfield, NM 87413

Agriculture MP Site Work Project
Infrastructure
Post-Bid
$563,000 CJ est. value
Shiprock, NM 87420

Last Updated 10/28/2022 05:13 AM
Project Title

Lake Farmington Outlet Piping (Tower Rehabilitation ) - City of Farmington

Physical Address View project details and contacts
City, State (County) Farmington, NM 87402   (San Juan County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected July 2024
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Lake Farmington was built in the late 1950. This existing pipe outlet through the dam has to be visually inspected every two years because it is a critical asset; this pipe needs to be rehabilitated to insure future reliability. This project is in included in the City of Farmington FY 2023-2027 Capital Improvement Plan (CIP). As of October 28, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents