Similar Projects
Joint Base San Antonio (JBSA) Fire Department Canopies
Bidding
Houston, Randolph, San Antonio, TX 78236

Replacement Canopy at Madla Transit Center
Post-Bid
San Antonio, TX

BPA for Dry Wall Repairs
Post-Bid
Fair Oaks Ranch, San Antonio, TX 78006

John Peace Library (JPL) Column Repair and Related Work
Results
$39,500 est. value
San Antonio, TX

Informal Annual Contract for Joint Sealants at the Alamodome
Term Contract
Results
San Antonio, TX 78203

Canopies
Post-Bid
San Antonio, TX 78236

Castle Point Exterior Renovations and Site Improvements
Results
San Antonio, TX

Golf Course Barrier Netting
Post-Bid
TX

ADC Infirmary/Booking Ceiling Replacement Project
Renovation
Results
San Antonio, TX 78200

Golf Barrier Netting & Installation
Post-Bid
San Antonio, TX

VIA Rebranding Project - Tile and Flooring
Results
$50,000 to $80,000 est. value
San Antonio, TX

Retaining Wall at Pieper Ranch Middle School
Post-Bid
Less than $980,000 est. value
San Antonio, TX 78260

Purchase and Installation of Two Water Fountains at Saws Headquarters
Results
San Antonio, TX

Shade Structures
Results
Less than $15,000 est. value
Fair Oaks Ranch, TX 78006

One Time Purchase and Installation of New Industrial Shelving, Bulk Racking and Pallet Racking
Results
San Antonio, TX 78200

Reported 12/13/2018 12:00 AM
Project Title

PUF FY16 Repair Loose Guardrail

Physical Address View project details and contacts
City, State (County) San Antonio, TX   (Bexar County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior, Finishes/Interior
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value $210,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description The project scope inside Main Building at 1604 main Campus is to demo and replace existing guardrail system with new. Proper fall protection must be provide for the academic, administration, and student population. Protection of surrounding flooring, tile, and walls must be executed. The work will be scheduled into phases by sections to avoid full area shutdown. Follow all measures for alternative work stated above.
Details
Division 09 - Finishes.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents