Similar Projects
Last Updated 09/10/2020 06:38 AM
Project Title

Airport Tank, Miriam Tank Modifications and Water Main Replacement

Physical Address View project details and contacts
City, State (County) Nappanee, IN 46550   (Elkhart County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Separate Bid Packages Division “A” – New Airport Tank Construction of a new 600,000 gallon elevated water storage tank with cathodic protection and a tank mixer, plus installation of approximately 650 feet of 16-inch ductile iron water main and appurtenances, a new altitude valve structure, replacement and/or rehabilitation of the altitude valves at the three existing elevated tanks, a stone access road from U.S. 6 to the tank site, fencing of the new tank site, plus testing, disinfection, and surface restoration. Division “B” – Miriam Tank Modifications Removal and proper disposal of the existing lead-based coatings on the exterior and dry interior surfaces of the existing 250,000 gallon single pedestal elevated water storage tank, raising the tank a distance of approximately 16 feet, surface preparation and coating of the interior and exterior surfaces of the elevated water storage tank, installation of a new cathodic protection system, installation of a new tank mixer, miscellaneous tank modifications and repairs, plus disinfection and surface restoration. Division “C” – Water Main Replacement Water main replacements within the City of Nappanee’s distribution system. The work includes approximately 3,200 LF of new 12-inch water main on US-6 (Market Street), 2,150 LF of new 12-inch water main on SR-19 (Main Street), 1,550 LF of new 6-inch water main on Locke Street, and 2,350 LF of new 6-inch water main on Centennial Street, together with all associated valves, hydrants, and connections to existing mains. The project also includes water service replacements at each water main replacement location, including the full length of the existing water service, from the City-Owned water main to within 1-foot of the foundation wall of the home or business being serviced.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents