Similar Projects
The Village at Loretto Heights
New Construction, Renovation
Conception
Denver, CO 80236

Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Switchgear and Protective Relay Maintenance
Alteration
Post-Bid
CO

2022 Academic Space Improvements - CM/GC
New Construction
Post-Bid
Denver, CO

Cu Anschutz Pn20-125493
Renovation
Results
Less than $3,078,000 est. value
Denver, CO

2016-034P15 Adams County Ysc Replacement Solar Photovoltaic
Term Contract
Results
Denver, CO

Bld-123 Lab Remodel - Center for Chemical and Biological Analysis
Renovation
Construction
Less than $150,000 est. value
Denver, CO 80204

Technical College Welding Shop Installation Services
Renovation
Construction
$150,000 CJ est. value
Denver, CO 80204

J059--UPS System & Generator Maintenance Services
Term Contract
Post-Bid
Denver, CO 80209

CU Anschutz PN19-142923- SCPP Only
Results
Less than $87,867 est. value
Denver, CO

Arts Building Restroom Remodel
Renovation
Post-Bid
Denver, CO 80204

Electrical Services
Term Contract
Results
Denver, CO

AHEC-22918-B - MSU Denver Fiber Loop Expansion
Alteration
Post-Bid
CO

Ikaa007 Dys Nightlight Installation (Calm)
Results
Less than $21,000 est. value
Golden, Lakewood, CO 80401

Commercial and Multifamily Building Electrification
Alteration
Post-Bid
Denver, CO

Last Updated 08/05/2022 09:09 AM
Project Title

Campus Main Switchgear Replacement

Physical Address View project details and contacts
City, State (County) Denver, CO 80204   (Denver County)
Category(s) Education, Single Trades
Sub-Category(s) College/University, Electric
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $928,533 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Bid material and labor to demo and install new 15kV medium voltage switchgear. Utilize existing primary selective radial feeds to install new equipment and limit the outage duration. Contractor to develop an equipment installation schedule for Auraria Higher Education Center (AHEC) project manager for approval. Weekend and 24-hour shift will be available to limit the duration of electric utility outages. Contractor to coordinate all utility outages with XCEL Energy and AHEC project manager. Identify and provide schedule for long lead items in bid. If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid. Estimated Construction Cost: $928,533.00 Date Email Questions Due August 11, 2022 at 5:00PM Date Email Answers Issued August 15, 2022 by 5:00PM Sealed Bids Due/Public Bid Opening August 18, 2022 at 2:00PM Negotiation of General Contractor Contract August 19 - 29, 2022 Contract Approval (projected) August 30, 2022 Anticipated General Contractor Start September 1, 2022 Anticipated Construction Start/Finish August 31, 2023

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents